New homeowners sometimes find early BESCOM bills that do not match their use. KERC's Conditions of Supply, published by BESCOM, let a consumer dispute meter accuracy, refer the meter to an approved third-party agency, pay a disputed bill under protest, and object to supplemental claims within 15 days. Here is how the process works.
The family moved in during the last week of the month. The first full bill arrives, and it shows a consumption figure that looks like a household twice the size. For new homeowners in Bengaluru, an odd early bill can be a worry, and the published rules give a clear path: question the meter in writing, have it tested by an independent agency, and pay under protest while the dispute is decided.
Those rules sit in the KERC Conditions of Supply of Electricity published on BESCOM's website. Clause 27 deals with the correctness of meters, and Clause 29 with billing and payment. Together they decide how much of a wrong bill can be corrected, and how far back.
The short answer. If you doubt your meter, give notice to BESCOM, which refers it to a third-party agency approved by KERC; you pay the testing fee directly to that agency. If the meter is outside accuracy limits, the bill is adjusted for the six billing months before your dispute up to the test date, and the fee is refunded. Meanwhile, complain in writing about the bill and pay it under protest by the due date. The trade-off: paying under protest keeps your supply safe while you dispute, but it means paying first and recovering later if you are right.
How do you dispute a meter's accuracy?
With a written notice. Clause 27.01 says that if the consumer disputes the accuracy of the meter, the consumer shall give notice to the licensee, which shall refer the meter for inspection or testing to a third-party agency approved by the Commission, informing the consumer. The consumer pays the specified testing fee directly to that agency.
The clause says the agency tests the meter using electronic testing equipment with an attached printer that gives an automatic printout of test readings, percentage error, date, time and RR number, and provides that printout to the consumer with a copy to the licensee. A note says KERC appointed the Chief Electrical Inspector to the Government of Karnataka as the third-party agency by notification dated 11 May 2006, published in the Karnataka Gazette on 25 May 2006, in line with the National Electricity Policy of 12 February 2005.
What happens if the meter is wrong?
The bill is recalculated, within a limit. Clause 27.01 says that if the meter is found incorrect beyond the accuracy limits prescribed by the relevant Central Electricity Authority regulations or Indian Standards, the licensee adjusts the bill according to the test result for the meter readings of the six billing months before the month in which the consumer disputed the meter, and up to the date of testing, having regard to working conditions and occupancy during that period. In such cases, the testing fee is refunded to the consumer.
For a new home, the occupancy point matters. If the house stood empty for part of the period, say so in your notice, and keep evidence such as the possession date, moving invoices and the date you started living there.
What does BESCOM's own periodic testing mean for you?
It can cut both ways. Clause 27.03 says that when the licensee tests a meter periodically and finds it slow beyond permissible limits, the consumer pays the difference at normal rates based on the percentage error for not more than six months before the test. When the meter is fast beyond the limits, the licensee adjusts the excess for not more than six months before the test, within one month of the test, by crediting the consumer's account, and pays interest at 1 percent per month for any delay in that adjustment.
The clause says the testing staff draw a mahazar and obtain the signature of the consumer or a representative as witness. If the consumer refuses to sign, the meter is referred to the third-party agency for testing on the spot within a week. Clause 27.02 adds that if a month's consumption is less than half of the previous month's, the licensee's engineer inspects the meter and records the reason for the shortfall. The table below brings the main timelines together.
| Situation | What the published conditions say |
|---|---|
| Consumer disputes meter accuracy | Notice to licensee; test by Commission-approved third-party agency; fee paid by consumer to agency |
| Meter found inaccurate after consumer's dispute | Bill adjusted for six billing months before the dispute up to test date; testing fee refunded |
| Meter found fast in licensee's periodic test | Excess for up to six months credited within one month; 1 percent per month interest for delay |
| Meter found slow in licensee's periodic test | Consumer pays the difference for up to six months before the test |
| Meter found not recording, other than tampering | Billed for up to six months on the average of the three previous properly recorded months |
What if the meter stops recording?
Billing switches to an average. Clause 27.04 says that if inspection or testing finds the meter not recording, for reasons other than tampering, the consumer is billed for a period of not more than six billing months before the inspection and up to replacement or rectification, based on the average consumption of the three preceding billing months when the meter was recording properly, plus demand or fixed charges. Where the meter was out of order for only a few days in a month, consumption is computed on a pro rata basis.
For a new connection, there may not yet be three months of proper readings to average from. If that happens, ask the sub-division office in writing how the bill will be computed, and keep the reply.
What about power failures and low voltage at a new home?
Those go to the local service station. Clause 21.00 says that in the event of failure or variation in voltage or frequency of supply, the consumer lodges a complaint with the jurisdictional service station or section office, and that such complaints are attended to within the time frame specified under the KERC (Consumer Complaints Handling Procedure) Regulations, 2004. Note the complaint number and time when you call.
The clause also says that if supply has failed because of a defect in the consumer's own system, the consumer is advised to rectify it, with the installation kept disconnected if the situation warrants, and it is reconnected after a qualified licensed electrical contractor certifies the rectification and reports it to the licensee. For a new home, an early failure may come from the home's own wiring, so keep your contractor's contact handy during the first months. Separately, the meter testing schedule in the conditions says installations whose average consumption is below 20 units per kW per month or above 300 units per kW per month are to be tested every year, which can bring a new home with low early use into the testing cycle.
Should you pay a bill you think is wrong?
Yes, under protest. A note to Clause 29 says any complaint about errors in a bill shall be made in person or in writing to the office of issue, and the amount of the bill shall be paid under protest within the due date. It says the licensee shall accept cash, cheque or demand draft at the cash counter where payment is made under protest.
Clause 29.03 deals with supplemental claims, such as those arising from a faulty meter or short billing. It says the licensee serves a provisional assessment order with 15 days' notice for the consumer to file objections, considers them, and then issues a final order. The consumer is asked to pay within 15 days of intimation, failing which supply may be disconnected and the amount treated as arrears. The clause says the final order must mention the KERC regulations on the consumer grievance redressal forum and ombudsman, which is your next step if you disagree. PropNewz explained how short claims can follow a property in today's guide to transferring a BESCOM connection after a resale.
How should a new homeowner handle a suspicious bill?
Document first, then dispute. If you have just bought the home, your deposits and their interest are covered in today's guide to BESCOM deposits on a Bengaluru home. For the bill itself, use this checklist.
- Photograph the meter reading with the date on the day you take possession and again on the day you move in.
- Compare the bill's readings with your photographs and note the difference.
- Complain in writing to the office that issued the bill and keep the acknowledgement.
- Pay the bill under protest by the due date so that supply is not affected.
- If you doubt the meter itself, give written notice asking for a third-party test, and pay the testing fee to the agency.
- Keep the agency's printout of test readings and percentage error.
- If a supplemental claim arrives, file objections within the 15 day notice period and keep copies.
Frequently asked questions
How do I dispute the accuracy of my BESCOM meter?
Clause 27.01 of the KERC Conditions of Supply says the consumer gives notice to the licensee, which refers the meter for testing to a third-party agency approved by the Commission. The consumer pays the testing fee directly to the agency, which provides a printout of test readings and percentage error to the consumer and the licensee.
Who is the third-party agency for meter testing?
A note to Clause 27.01 says KERC appointed the Chief Electrical Inspector to the Government of Karnataka as the third-party agency by notification dated 11 May 2006, published in the Karnataka Gazette on 25 May 2006, in line with the National Electricity Policy of 12 February 2005.
How far back can a bill be adjusted if the meter is wrong?
Clause 27.01 says that if the meter is found incorrect beyond prescribed accuracy limits, the bill is adjusted for the six billing months before the month of the dispute and up to the testing date, considering working conditions and occupancy during that period, and the testing fee is refunded to the consumer.
Should I pay a bill I believe is wrong?
The conditions say a complaint about errors in a bill should be made in person or in writing to the office of issue, and the bill should be paid under protest by the due date. The licensee shall accept payment made under protest at the cash counter, so pay and dispute at the same time.
Last updated 2026-11-25. PropNewz Team.