Abhee Celestial City Review: Varthur 2 and 3 BHK Homes Assessed
RERA registered 2 and 3 BHK homes from Rs 1.39 Cr with June 2029 possession, held back by a congested Varthur commute.
A Phase 2 for Abhee Celestial City is now being talked about along Varthur Sarjapur Road. BookNewProperty updated its report on the proposal on November 4, 2026, though it gives no size, tower count or RERA number yet. That is a reminder that the corridor around Chikkavaderapura is still filling up. Phase 1, the subject of this review, is a 399 home high-rise with a RERA completion date of June 30, 2029 and an entry price of about Rs 1.39 Cr.
Short answer: Abhee Celestial City offers 2 BHK and 3 BHK apartments of about 1,345 to 1,990 sq ft, priced from about Rs 1.39 Cr to Rs 2.01 Cr (August 2026 list), on Varthur Sarjapur Road near Dommasandra. It is RERA registered (PRM/KA/RERA/1251/308/PR/071123/006380) with possession stated as June 2029. The biggest trade-off is location: you get a newer high-rise at a fair ticket, but daily travel runs through one of East Bengaluru's slowest road stretches.
What is Abhee Celestial City and who is it for?
Abhee Celestial City is an under construction apartment project marketed by Abhee Ventures on Varthur Sarjapur Road. The PropNewz page lists 4.8 acres, 399 units, six towers and a height of basement plus ground plus 26 floors. The developer site describes Phase 1 as about 5 acres with 397 homes in three towers of B2 plus ground plus 26 floors, and claims 73% open space.
It is aimed at mid-career families who want a 3 BHK under Rs 2 Cr near the Sarjapur Road and Whitefield job belts, and at first-time 2 BHK buyers stretching to a gated high-rise. It will appeal less to investors chasing near-term rental yield, since handover is roughly two and a half years away.
Who is Abhee Ventures and what is their track record?
Abhee Ventures is a Bengaluru developer founded in 2009, with a concentration of projects in East and South Bengaluru such as Abhee Silicon Shine at Mullur off Sarjapur Road. Published counts of delivered projects range widely across portals and press, from a handful to more than 25, and most of these figures are self reported. The developer's own history describes Celestial City as its first high-rise on this road, launched in 2023.
One detail matters for paperwork. The Karnataka RERA record lists the promoter as Nexplace Infrastructure, a partnership firm, not Abhee Ventures by name. That is common for project-specific entities, but you should know which entity signs your agreement and holds the escrow account. Abhee is also active nearby with Abhee Aaria on Gunjur Road and a larger township, Abhee City Urban Glenn.
Where is it located and how is the connectivity?
The project sits at Chikkavaderapura on Varthur Sarjapur Road, in Anekal taluk with postal code 562125. The developer cites about 4.4 km to Kshema Hospital, 8.8 km to RGA Tech Park, 9.2 km to Wipro Technologies and 10.5 km to Embassy Tech Village, with Greenwood High a short drive away. In a straight line, the site is about 10 km from ITPL in Whitefield.
Road access is the weak link. A September 2026 Deccan Herald report found the Rs 482 crore Varthur to Gunjur elevated corridor on SH-35 still crawling, years behind its original deadline. In November 2026 the state added Rs 1,118 crore to the Peripheral Ring Road, which is planned to link Sarjapur, Dommasandra, Gunjur and Varthur, per Trade Brains and Deccan Herald. No opening date has been given, so treat both as long-term upside rather than reasons to buy today.
What homes, sizes and amenities does it offer?
Three formats are listed. The 2 BHK with two toilets is about 1,345 sq ft. The 3 BHK with two toilets runs from 1,595 to 1,685 sq ft, and the 3 BHK with three toilets from 1,895 to 1,990 sq ft. The developer site labels the middle unit a 2.5 BHK and shows slightly different sizes in its FAQ, so rely on the carpet area in your agreement rather than the brochure.
The amenity list on the developer site is broad: clubhouse, heated pool, gym, yoga deck, jogging track, badminton and squash courts, amphitheatre, daycare, guest rooms and small retail such as grocery and medical stores. In a 26 floor tower, lift count per core and fire safety design matter as much as amenities, so ask for both.
What does it really cost, including taxes and charges?
As per the August 2026 price list, the 2 BHK is about Rs 1.39 Cr, the 3 BHK with two toilets Rs 1.63 Cr to Rs 1.72 Cr, and the 3 BHK with three toilets Rs 1.92 Cr to Rs 2.01 Cr, excluding stamp duty and registration. The developer site now headlines higher starting figures of about Rs 1.51 Cr to Rs 1.55 Cr, so the August list may already be stale.
On a Rs 1.39 Cr home, GST at 5% on an under-construction purchase adds roughly Rs 7 lakh, and Karnataka stamp duty of about 6.6% including cess plus 1% registration adds roughly Rs 10.5 lakh. Car park charges, maintenance deposit, corpus fund, floor rise and any infrastructure or club charges are not published and are to be confirmed with the builder. Expect the all-in figure to land well above the headline price.
What is the RERA, approval and possession status?
Phase 1 is registered with Karnataka RERA under PRM/KA/RERA/1251/308/PR/071123/006380, approved November 7, 2023, with a proposed completion date of June 30, 2029. The record shows 399 units, construction in progress, no complaints and no extensions. The developer states the project is BDA approved. The PropNewz page's June 2029 possession matches the RERA date, which is a good sign. The proposed Phase 2 has no RERA registration that we could find, so do not let a Phase 2 pitch blur into your Phase 1 paperwork.
How does Abhee Celestial City compare with nearby projects?
Two strong comparisons sit very close. Mana Skanda The Right Life Forest Province is about half a kilometre away in a larger township, and DSR The Courtyard in Gunjur is nearer completion. Sobha Neopolis Phase 2 in Panathur offers a branded alternative at a similar ticket.
| Dimension | Abhee Celestial City | Mana Skanda Forest Province | DSR The Courtyard | Sobha Neopolis Phase 2 |
|---|---|---|---|---|
| Price band | Rs 1.39 Cr to Rs 2.01 Cr | Rs 1.66 Cr to Rs 2.71 Cr | Rs 1.08 Cr to Rs 1.74 Cr | Rs 1.58 Cr to Rs 2.02 Cr (indicative) |
| Configurations | 2 BHK, 3 BHK | 2 BHK plus study to 4 BHK | 2 BHK, 3 BHK | 3 BHK |
| Possession | June 2029 | December 2030 (Phase 1) | February 2027 | December 2030 |
| RERA status | Registered (006380) | Registered (008521, 008522) | Registered (006759) | Registered (006270) |
| Distance to ITPL (approx., straight line) | About 10 km | About 10 km | About 7.5 km | To be confirmed |
Celestial City sits in the middle on price and timing. DSR is cheaper and earlier, Mana is larger and later, and Sobha carries a bigger brand at a similar cost.
What are the risks and trade-offs buyers should weigh?
Data consistency is the first issue. Tower count is six on the PropNewz page, three on the developer site and one in the RERA mirror, and land area and unit sizes also differ slightly. These are probably labelling differences, but the sanctioned plan is the only document that counts. The second is the commute: Varthur and Dommasandra junctions are chronic bottlenecks until the corridor and ring road open. The third is the 2029 timeline, which means rent and EMI may overlap for years. The fourth is pricing drift, since the developer now quotes higher than the August list.
| # | Check before booking |
|---|---|
| 1 | Verify PRM/KA/RERA/1251/308/PR/071123/006380 and the promoter name on rera.karnataka.gov.in |
| 2 | Get a dated all-in cost sheet with car park, deposits, floor rise and GST |
| 3 | Confirm the tower, floor and carpet area of your unit against the sanctioned plan |
| 4 | Check the latest quarterly progress report filed on the RERA portal |
| 5 | Ask for the BDA approval and occupancy certificate timeline in writing |
| 6 | Confirm the escrow bank account belongs to the RERA registered promoter |
| 7 | Test the commute to your office at peak hour through Varthur and Dommasandra |
What do buyers most often ask about Abhee Celestial City?
What is the price of Abhee Celestial City?
Abhee Celestial City is priced from about Rs 1.39 Cr to Rs 2.01 Cr as per the August 2026 price list, excluding stamp duty and registration. The 2 BHK is about Rs 1.39 Cr, while the developer's own site now quotes higher starting figures, so ask for a dated, written cost sheet before you commit.
Is Abhee Celestial City RERA registered?
Yes. Abhee Celestial City Phase 1 is registered with Karnataka RERA under PRM/KA/RERA/1251/308/PR/071123/006380, approved on November 7, 2023. The registered promoter is Nexplace Infrastructure, a partnership, rather than Abhee Ventures by name, so confirm who signs your agreement and verify the record on rera.karnataka.gov.in.
When is possession at Abhee Celestial City?
Possession at Abhee Celestial City is stated as June 2029, which matches the RERA completion date of June 30, 2029. That is more than two and a half years away, so budget for rent or EMI overlap, and ask for the latest quarterly construction progress filed on the RERA portal before booking.
What is the track record of Abhee Ventures?
Abhee Ventures is a Bengaluru developer founded in 2009 with a large East and South Bengaluru portfolio, including Abhee Silicon Shine off Sarjapur Road. Its delivery counts vary across sources and are largely self reported, and Celestial City is described as its first high-rise, so check completed projects and timelines yourself.
Is Abhee Celestial City a good buy?
Abhee Celestial City is a reasonable choice for end users who want a RERA registered 2 or 3 BHK under about Rs 2 Cr in the Sarjapur and Varthur belt and can wait for mid 2029. The registration is clean, the possession date on the page matches RERA, and the price sits below several branded neighbours. Against that, the developer is newer to high-rises, published specifications conflict in places, and the road network around it will stay strained for years. Lock in a written all-in price, verify the promoter and plan details, and compare with DSR The Courtyard and Mana Skanda before you sign.
This review reflects information available as of November 16, 2026.
Talk to PropNewz to evaluate this project. Let's chat.
By PropNewz Team
Contact Us
Stay updated with latest news and new projects!
Tell us what you want, We'll do the rest.
Share your budget and where you're looking. An advisor who has actually walked the sites will shortlist a handful of RERA-registered projects and tell you which to skip.