Sattva Vasanta Skye Review: Devanahalli 1 and 3 BHK Homes Near the Airport Assessed
An open, low density Sattva project near the airport, but completion is set for 2031 and per sq ft pricing is above nearby options.
Traffic police diverted goods vehicles and buses off Ballari Road from November 6, 2026, when the Bangalore Development Authority began an 18 month, Rs 420 crore build of an elevated corridor up to Mekhri Circle, Angel One reported. Ballari Road is the same NH 44 spine that leads to Kannamangala, the airport side pocket of Devanahalli where Salarpuria Sattva is building Sattva Vasanta Skye. Better roads are coming. For now, buyers here are paying for a future that is still under construction.
Short answer: Sattva Vasanta Skye is a RERA registered Salarpuria Sattva apartment project in Devanahalli with available 1 BHK and 3 BHK homes from about Rs 86.5 lakh to Rs 2.04 crore (September 2026 price list), and a stated completion of May 6, 2031. Its strength is a low density, open layout near the airport. Its biggest trade-off is a wait of about four and a half years, with studios and 2 BHKs already sold out.
What is Sattva Vasanta Skye and who is it for?
Sattva Vasanta Skye is a large apartment community on roughly 15.8 to 16 acres at Kannamangala, off Bellary Road, near Kempegowda International Airport. The PropNewz listing records 1,077 units, a figure the July 2025 launch report also gives. The builder emphasises open space: its site claims about 13 acres of greenery and towers spaced 113 to 180 metres apart, which is unusual at this scale.
The project suits people who work, or expect to work, in the airport economy and want a gated community with breathing room. With studios and 2 BHKs gone, the live inventory is a 1 BHK for singles and investors and two 3 BHK formats for families.
How reliable is Salarpuria Sattva as a developer?
Salarpuria Sattva is one of the bigger names in Bengaluru real estate, with residential, office and mixed use work across the city and several North Bangalore projects, including Sattva Park Cubix Phase 2 nearby. That depth matters for a five year build, because a developer with steady cash flow is better placed to keep sites moving.
Size is not a guarantee. Visit a recent Sattva handover, look at common area finishing, and ask residents how close the builder came to its promised date. The builder site posts construction updates through October 2026, which is a useful habit; track them against the RERA quarterly filings.
Where is it located and how is the connectivity?
The site sits about 5 km in a straight line from the airport terminal, by PropNewz calculation from the listing coordinates, on the western side of the airport along Bellary Road. The Sattva project page lists Prestige Tech Cloud at about 4 km, the upcoming Bengaluru Signature Business Park at 5.7 km, KIADB Hardware Park at 12.9 km, KIADB Aerospace Park at 14.6 km and the Foxconn site at 19 km. Those are builder figures, so check them on a map.
The weak link is the city commute. Everything south funnels through Hebbal, where the Ballari Road corridor works run until roughly mid 2028. Rail relief is also later than once hoped: the Blue Line to the airport has had its full opening pushed to March 2028, with the Hebbal to airport stretch targeted for September or October 2027, according to Construction World. Plan on road commutes for the first years.
What homes and amenities does it offer?
The listing shows studios of about 454 sq ft and 2 BHKs of about 1,138 sq ft, both sold out, plus a 1 BHK of about 731 sq ft and 3 BHKs of about 1,509 sq ft with two bathrooms and 1,831 sq ft with three. Sattva's site also refers to 4 BHK, duplex and cluster formats, which the listing does not price, so ask what is actually on offer.
Amenities centre on a one acre clubhouse with three multipurpose halls and a rooftop pool, themed gardens, sports areas and what the builder calls more than 50 lifestyle features. Treat these as plan commitments to verify on the approved layout, not as finished facilities.
What will it really cost?
The September 2026 price list quotes a base rate of Rs 9,890 per sq ft, with a 1 BHK at about Rs 86.5 lakh, a 3 BHK with two bathrooms at about Rs 1.7 crore and the larger 3 BHK at about Rs 2.04 crore, excluding stamp duty and registration. Multiplying the base rate by area gives lower numbers (about Rs 72 lakh for the 1 BHK and Rs 1.49 crore for the smaller 3 BHK), which suggests some charges are already bundled into the quoted prices.
The listed extras are development and infrastructure at Rs 280 per sq ft, Rs 1 lakh for generator and gas piping, a Rs 2.5 lakh amenities charge, Rs 50,000 legal and facility fees, a corpus of Rs 40 per sq ft, one year of advance maintenance at Rs 36 per sq ft, floor rise of Rs 30 per sq ft per floor from the third floor, and preferential location charges where they apply. GST is extra at actuals, and the under construction home attracts 5 percent GST.
PropNewz arithmetic for the 1,509 sq ft 3 BHK: if Rs 1.7 crore already covers the extras and GST, stamp duty of approximately 6.6 percent including cess and 1 percent registration on property above Rs 45 lakh add roughly Rs 13 lakh, for an all in figure near Rs 1.83 crore. If they are not included, the total climbs further. Ask for one consolidated number.
Is it RERA approved, and when is possession?
Yes. The project is registered with Karnataka RERA under PRM/KA/RERA/1250/303/PR/080525/007730, and the approval status on the listing is Approved. The builder site shows the same number. One listing portal flags litigation without giving detail; PropNewz could not verify that, so read the litigation disclosure on the RERA portal yourself.
Stated completion is May 6, 2031, per the September 2026 inventory update. One portal quotes December 2031 as the RERA date. The listing describes four towers of B + G + 13 floors, while the builder's site and launch coverage describe three towers, and one floor plan file is labelled typical 27, which hints at taller blocks. Get the tower count, floor count and completion date confirmed in writing.
How does it compare with nearby projects?
Airport belt buyers usually also look at Laurel and Maple at Brigade Orchards and Arvind Orchards on the STRR side. Figures come from PropNewz project records; distances are approximate straight line measures.
| Dimension | Sattva Vasanta Skye | Sattva Park Cubix Phase 2 | Laurel and Maple at Brigade Orchards | Arvind Orchards |
|---|---|---|---|---|
| Price band | Rs 86.5 L to Rs 2.04 Cr | Rs 35.9 L to Rs 1.59 Cr | Rs 99 L onwards | Rs 1.05 Cr to Rs 2.10 Cr plus PLC (Phase 3, basic) |
| Configurations | 1 BHK and 3 BHK available | Studio, 1, 2 and 3 BHK | To be confirmed | To be confirmed |
| Possession | May 6, 2031 (stated) | Sep 2029 (stated) | March 2030 (K-RERA) | December 2029 for Phases 1 and 2 (K-RERA) |
| RERA status | Registered, 007730 | Registered, 007529 | Registered, 008505 | Registered, 006600 (Phases 1 and 2) |
| Straight-line distance to KIA (approx) | 5 km | 5 km | 4 km | 10 km |
Vasanta Skye has the latest completion and the highest per sq ft rate in this group, in exchange for more open space. Park Cubix Phase 2 is cheaper and earlier; Brigade Orchards is an established township.
What are the risks and trade-offs?
Time is the main risk. A May 2031 completion is far enough away that market cycles, approvals and contractor issues can all intervene, and every month of delay adds rent and EMI pressure for end users. The second risk is data: land area, tower count, floor count and configurations differ between the listing and the builder's pages. The third is inventory. With studios and 2 BHKs sold out, choice is narrow. The fourth is the commute, which depends on infrastructure due in 2027 and 2028.
| # | Check before booking |
|---|---|
| 1 | Verify PRM/KA/RERA/1250/303/PR/080525/007730 on rera.karnataka.gov.in, including tower coverage, completion date and the litigation section. |
| 2 | Ask Sattva to confirm the tower count, floor count and land area in writing, since the listing and the builder site differ. |
| 3 | Get a unit cost sheet that shows whether development charges, amenities fee and GST are inside the quoted price. |
| 4 | Calculate floor rise at Rs 30 per sq ft per floor from the third floor for your exact unit. |
| 5 | Confirm the payment plan is construction linked and read the delay compensation clause. |
| 6 | Check the latest construction photos and quarterly RERA progress against the May 2031 target. |
| 7 | Drive the route to your workplace at peak hour while Ballari Road works are under way. |
What do buyers most often ask about Sattva Vasanta Skye?
What is the price of Sattva Vasanta Skye?
Available homes at Sattva Vasanta Skye are priced from about Rs 86.5 lakh for a 1 BHK to about Rs 2.04 crore for a 3 BHK with three bathrooms, per the September 2026 price list. Studios and 2 BHKs are listed as sold out, and stamp duty and registration are extra.
Is Sattva Vasanta Skye RERA registered?
Yes, Sattva Vasanta Skye is registered with Karnataka RERA under PRM/KA/RERA/1250/303/PR/080525/007730, and the builder's website shows the same number. Before paying, check on rera.karnataka.gov.in which towers the registration covers, the declared completion date, any litigation disclosure and the latest quarterly progress report.
When is possession at Sattva Vasanta Skye?
Stated completion is May 6, 2031, per the September 2026 inventory update, which makes this a four and a half year wait. One listing portal quotes a December 2031 RERA date instead. Confirm the completion date on the RERA portal and in your agreement before committing any money.
Who should consider Sattva Vasanta Skye?
It suits buyers with a long horizon who work or expect to work around the airport, aerospace park and new business parks, and who value a low density layout with a lot of open space. It suits less well anyone who needs a home before 2031 or wants a 2 BHK, which is sold out.
What is the PropNewz verdict on Sattva Vasanta Skye?
Sattva Vasanta Skye is worth a look for patient buyers who want a branded, RERA registered home near the airport with more open space than most neighbours. It is not a near term move in option, and the price per sq ft is higher than nearby alternatives. Shortlist it only after the RERA filing, the tower details and a consolidated cost sheet line up.
This review reflects information available as of November 16, 2026.
Talk to PropNewz to evaluate this project. Let's chat.
By PropNewz Team
Contact Us
Stay updated with latest news and new projects!
Tell us what you want, We'll do the rest.
Share your budget and where you're looking. An advisor who has actually walked the sites will shortlist a handful of RERA-registered projects and tell you which to skip.