Hasiru Visthara Review: New Apartment Launch off Kanakapura Road, Bengaluru
A RERA registered 124-home launch off Kanakapura Road with low density, but no price, no unit plans and a promoter with no visible record.
On Sunday, October 11, 2026, more than 100 residents formed a human chain at Rose Garden Junction in south Bengaluru to oppose a proposed elevated road, South First reported. The corridor, planned by Bengaluru Smart Infrastructure Limited, would run about 17 km from Ragigudda to Kanakapura Road near the Thalaghattapura NICE Road junction, and its own project report projects peak-hour traffic at Rose Garden to nearly double between 2025 and 2035. Three weeks later, on October 31, a little-known promoter registered a 124-apartment project in B.M Kavale Village, Kengeri Hobli, which PropNewz lists under Kanakapura Road. That project is Hasiru Visthara, and the traffic debate is a fair place to start a review of it.
The short answer: Hasiru Visthara is a Karnataka RERA registered apartment project (PRM/KA/RERA/1251/310/PR/311026/009069) of 124 homes on 2.57 acres at B.M Kavale Village, Kengeri Hobli, off Kanakapura Road, with a declared completion date of December 31, 2030. It is listed as Upcoming, price is on request, and the BHK mix is not disclosed. The biggest trade-off is information: the promoter, Hasiru Realty LLP, has no web footprint PropNewz could find, and you would be waiting over four years for possession.
What is Hasiru Visthara and who is it for?
Hasiru Visthara is a 124-unit apartment project on part of Sy. No. 288/4 in B.M Kavale Village, Kengeri Hobli, Bangalore South Taluk (PIN 560082). The RERA record lists it as a new project launch, with plan approval from the Bengaluru Mysuru Infrastructure Corridor Area Planning Authority (BMICAPA) dated July 13, 2026. All of this sits on the PropNewz project page for Hasiru Visthara.
The natural buyer is a south Bengaluru family or professional who wants a newer apartment in the Kanakapura Road belt at what are likely to be lower prices than inside the NICE Road ring, and who is buying for the long term. It is a poor fit for anyone who needs a home before 2031, or who wants the resale liquidity that comes with a known developer.
Who is Hasiru Realty and what is its track record?
Hasiru Realty LLP is the promoter named on the RERA record, and PropNewz could find no completed project, website or press coverage for it. Its PropNewz builder profile lists one ongoing project, which is this one. A web search for the project and promoter names returned no listings at all as of November 19, 2026.
A missing footprint is common for project-specific LLPs, which are often formed for a single landholding or a joint development with the landowner. It does not mean the project is unsound, but it shifts the work to you. Ask who the designated partners are, what they have built before under other names, who the construction contractor will be, and whether a bank has approved the project for home loans. A bank's legal and technical approval is one of the few independent checks available on a promoter with no history.
Where is Hasiru Visthara and how is the connectivity?
Hasiru Visthara is in B.M Kavale Village in Kengeri Hobli, Bangalore South Taluk, listed by PropNewz under Kanakapura Road. The RERA list carries no map pin, and PropNewz has not confirmed how far the site is from Kanakapura Road or the NICE Road junction, so confirm the exact site and the approach road on a visit before trusting any distance in a brochure.
The planning authority tells you something about the location. BMICAPA plans the area along the Bangalore Mysore Infrastructure Corridor, which includes land around NICE Road, rather than the BDA or the city corporation. That generally means a more peripheral setting, where civic services such as piped water, sewerage and roads may be less complete than in older parts of the city. Ask the promoter how water and sewage will be handled at handover.
The upside is the Green Line metro, which already runs along Kanakapura Road to its southern end, and the NICE Road link toward Mysuru Road and Electronic City. The downside is the traffic on Kanakapura Road itself. The elevated corridor in the October report is only a proposal facing organised resident opposition, with a project report that budgets Rs 489.4 crore for land and structure acquisition alone. Do not buy here on the assumption that it will be built.
What homes does Hasiru Visthara offer?
The RERA list gives a total of 124 apartments and nothing else about the homes: no BHK mix, no carpet areas, no tower or floor count. PropNewz found no aggregator listing to fill the gap. You will need floor plans with RERA carpet areas from the promoter before you can compare it with anything.
The one useful number is density. At about 48 homes per acre by PropNewz arithmetic, Hasiru Visthara is less dense than many small launches elsewhere in the city, which leaves room for more open space, parking and perhaps a modest clubhouse. Whether that potential is used depends on the site plan, so ask for it, and ask for the amenity list and specification sheet in writing as part of your agreement.
What will a home at Hasiru Visthara really cost?
No price list has been published, and PropNewz gives no estimate. Ask for a cost sheet that separates the basic rate, car parking, GST, utility deposits, clubhouse charges, the corpus fund and maintenance advance, with stamp duty and registration listed separately.
The statutory costs are predictable. GST on an under-construction apartment is 5 percent of the agreement value, without input tax credit, for non-affordable units. Stamp duty in Karnataka is about 5.6 percent including cess and surcharge for properties above Rs 45 lakh, plus a registration fee of 2 percent (doubled from 1 percent in August 2025), about 7.6 percent in all; confirm current rates on the Kaveri portal. On an illustrative Rs 80 lakh agreement, those two items add about Rs 10.1 lakh. On a peripheral project, also ask about water and sewage arrangements, since a tanker-dependent or STP-heavy setup will show up in your maintenance bill.
Is Hasiru Visthara RERA approved and when is possession?
Yes. Hasiru Visthara is registered with Karnataka RERA under PRM/KA/RERA/1251/310/PR/311026/009069, dated October 31, 2026, and BMICAPA approved the plan under Plan No. BMICAPA/196/2025-26 on July 13, 2026. The declared completion date is December 31, 2030.
The RERA ID shown here is from the PropNewz project page. Verify it on rera.karnataka.gov.in and match the promoter, the survey number, the Katha PID, the 124 unit count and the completion date to your agreement for sale. The land is recorded as part of a survey number, so ask your lawyer to confirm how the project parcel was carved out and that the khata covers exactly that portion.
How does Hasiru Visthara compare with other Kanakapura Road projects?
Kanakapura Road has both branded and small-builder launches registered this year. The table compares Hasiru Visthara with a branded project and a small project with the same completion year.
| Dimension | Hasiru Visthara | Azalea at Brigade Meadows | Zed Windsor |
|---|---|---|---|
| Price band | Price on Request | Rs 1.25 Cr onwards | Price on Request |
| Configurations | Apartments (BHK mix to be confirmed) | Apartments (BHK mix to be confirmed) | Apartments (BHK mix to be confirmed) |
| Possession | December 2030 (RERA) | July 2029 (K-RERA) | December 2030 (RERA) |
| RERA status | Registered, PRM/KA/RERA/1251/310/PR/311026/009069 | Registered, PRM/KA/RERA/1251/310/PR/180826/008875 | Registered, PRM/KA/RERA/1251/310/PR/281026/009047 |
| Locality | B.M Kavale, Kanakapura Road | Kanakapura Road | JP Nagar (Kanakapura Road) |
Azalea at Brigade Meadows is the branded benchmark, with a published starting price of Rs 1.25 crore and an earlier completion date. Zed Windsor shares the December 2030 timeline but sits closer to the city. Hasiru Visthara needs to come in clearly cheaper than both to make sense, given its location and the unknown promoter.
What are the risks and what should you check before booking?
The main risks are a promoter with no visible record, almost no disclosure on the homes, a long build, peripheral civic infrastructure and heavy traffic on the main access road. That is a long list, and each item needs a specific answer before you pay.
| # | Check before booking |
|---|---|
| 1 | Verify the RERA ID on rera.karnataka.gov.in and match Sy. No. 288/4 (Part), 124 units and the December 31, 2030 date. |
| 2 | Get a written cost sheet with base rate, parking, GST, deposits, clubhouse, corpus and maintenance listed separately. |
| 3 | Ask for floor plans with RERA carpet area, the site plan and a written specification sheet. |
| 4 | Ask who the LLP's partners are and what they have built before, and visit a past project. |
| 5 | Have a lawyer check title, the part survey number carve-out, the khata and the BMICAPA approval. |
| 6 | Confirm water supply, sewage treatment and power arrangements at handover. |
| 7 | Drive from the site to your workplace at peak hour via Kanakapura Road and NICE Road. |
What do buyers ask most about Hasiru Visthara?
What is the price of Hasiru Visthara?
The price is on request. No price list has been published as of November 2026, so ask for a cost sheet and add 5 percent GST and about 7.6 percent stamp duty and registration to any quoted base price.
Is Hasiru Visthara RERA registered?
Yes. It is registered with Karnataka RERA under PRM/KA/RERA/1251/310/PR/311026/009069 since October 31, 2026, with BMICAPA plan approval. Verify it on rera.karnataka.gov.in.
When will Hasiru Visthara be ready?
The declared RERA completion date is December 31, 2030. The project is at launch stage, so allow for some slippage beyond that date.
Who is the developer of Hasiru Visthara?
The promoter is Hasiru Realty LLP. PropNewz found no completed projects or website for it, so check its partners and their history before booking.
What is the PropNewz verdict on Hasiru Visthara?
Hasiru Visthara is a properly registered, plan-approved project with relatively low density in a part of south Bengaluru that has a working metro line and long-term growth. But it asks buyers to commit with almost nothing disclosed: no price, no unit plans, no promoter history and a 2030 handover. For now it belongs on a watch list. Revisit it once the promoter publishes a price list and floor plans, and compare it hard against Azalea at Brigade Meadows and Zed Windsor before you consider a booking.
This review reflects information available as of November 19, 2026.
Talk to PropNewz to evaluate this project. Let's chat.
By PropNewz Team
Contact Us
Stay updated with latest news and new projects!
Tell us what you want, We'll do the rest.
Share your budget and where you're looking. An advisor who has actually walked the sites will shortlist a handful of RERA-registered projects and tell you which to skip.