Shree Vari Aura Review: 108 Apartments at Horamavu Agara, East Bengaluru
A RERA-registered 108-home Horamavu project near the future airport metro; long wait to 2031 and an unverified builder record.
Within twelve days, one small Horamavu developer put two projects on the Karnataka RERA register. Shree Vari Aura was registered on 31 October 2026, and its sister building Shree Vari Aeris followed on 11 November. Aura is the larger of the two by far: 108 apartments on 1.55 acres at Horamavu Agara, with a declared completion date of 31 March 2031. For buyers in East Bengaluru, it is a mid-sized, locally built option in a suburb that will sit on the airport metro line once the Blue Line is finished.
The short answer: Shree Vari Aura is an apartment project of 108 homes on 1.55 acres at Horamavu Agara by Shree Vari Projects, K-RERA registered under PRM/KA/RERA/1251/446/PR/311026/009071 with a declared completion date of 31 March 2031. Price is on request; a listing portal describes 2 and 3 BHK homes, which the public RERA list does not confirm. The biggest trade-off is the long wait to 2031 from a small developer whose earlier delivery record PropNewz could not independently verify.
What is Shree Vari Aura and who is it for?
Shree Vari Aura is a residential apartment project on Sy No 51/9, 51/10, 51/11 and 51/12, Horamavu Agara Village, K R Puram Hobli, Bengaluru East (PIN 560113). The Shree Vari Aura project page on PropNewz lists it under Horamavu with status Under Construction, and RERA records it as ongoing. Density works out to about 70 homes per acre by PropNewz arithmetic, a mid-rise community rather than a tower township.
It suits a family or professional who works around Hennur, Kalyan Nagar, Manyata Tech Park, the ORR or Whitefield, wants a mid-sized society rather than a 1,000-home complex, and can wait until 2031. It is a weaker fit for buyers who need a home in the next two to three years, want a large-format amenity package, or will only buy from a listed developer.
Who is Shree Vari Projects and what is the track record?
Shree Vari Projects is a Bengaluru developer and the K-RERA promoter of both Shree Vari Aura and Shree Vari Aeris at Horamavu. The PropNewz review of Shree Vari Aeris describes the firm as a small, locally focused partnership and notes an earlier registered project, Shreevari Grandeur, with a listed completion date of 31 March 2025 according to a RERA tracker. No independent reporting on Grandeur's delivery, resident feedback or litigation was found, so the track record remains unconfirmed.
The practical test is a visit. Go to Shreevari Grandeur, ask residents when they got their keys, whether an occupancy certificate was issued, and how the builder handled defects. Then search the promoter name on rera.karnataka.gov.in for every registration and its completion status. A 108-home project is a step up in scale from a 40-home building like Aeris, so ask how construction will be funded and phased.
How well is Horamavu connected?
Horamavu sits between Hennur Road, Kalyan Nagar and K R Puram, with the Outer Ring Road a short drive away. The main future upgrade is the Namma Metro Blue Line, whose K R Puram to airport section includes a planned Horamavu station. In August 2026, Business Today reported that the 58.19 km Blue Line was 72 percent complete, with the full line targeted for completion by the end of 2027 and sections opening in phases.
Until then, Horamavu's roads carry heavy traffic toward Hennur, Kalyan Nagar and the ORR, and metro construction along these corridors adds to the congestion. PropNewz found no new Horamavu-specific announcement in the 30 days to 19 November 2026. The distance from the site to the planned station is to be confirmed, because the RERA list has no location pin, so check it on a visit.
What homes does Shree Vari Aura offer?
The RERA list confirms 108 apartments on 1.55 acres but not the BHK mix or carpet areas. A Square Yards listing describes 2 BHK homes of about 1,162 sq ft and 3 BHK homes of about 1,614 and 1,733 sq ft saleable, in two wings. Those are portal figures, not RERA-filed plans, and floor plans on that page are marked as coming soon.
If the 2 and 3 BHK mix holds, the sizes are typical of the Horamavu mid-segment. The same portal lists basic amenities such as a children's play area, yoga space, power backup and security, while its master plan text also mentions a pool and clubhouse; ask the builder which of these are in the RERA filing. A 108-home community spreads maintenance costs better than a small block, which is a practical advantage over boutique buildings nearby.
What will it really cost to buy here?
The price is on request, with no price list published as of November 2026, and PropNewz shows no estimate. Ask for a cost sheet that separates the basic rate, car parking, GST, utility deposits, any clubhouse charge, the corpus fund and maintenance advance, with stamp duty and registration listed separately.
On an under-construction apartment, GST is 5 percent of the agreement value without input tax credit. Karnataka stamp duty is about 5.6 percent including cess and surcharge for properties above Rs 45 lakh, plus a registration fee of 2 percent (doubled from 1 percent in August 2025), about 7.6 percent in all; confirm current rates on the Kaveri portal. Compare offers on the all-in amount per sq ft of carpet area, and get the price lock and payment schedule in writing.
Is Shree Vari Aura RERA registered and when is possession?
Yes. Shree Vari Aura is registered with Karnataka RERA under PRM/KA/RERA/1251/446/PR/311026/009071, dated 31 October 2026, with a declared completion date of 31 March 2031. The building plan, No. GBA/BECC/0446/2025-26, was approved on 29 September 2026 by the local planning authority named on the RERA record. The RERA ID shown here is from the PropNewz project page; verify it on rera.karnataka.gov.in.
One naming detail matters. The RERA record for the sister project Shree Vari Aeris reportedly names its building "Shreevari Aura", while this project carries the Aura name with its own registration. Match every document, receipt and agreement by registration number, not by project name.
How does Shree Vari Aura compare with nearby options?
The closest comparisons are the builder's own Shree Vari Aeris, a 40-home building with an earlier date, and SLV Mirae in Horamavu, another recent RERA registration.
| Dimension | Shree Vari Aura | Shree Vari Aeris | SLV Mirae | Sathvik Signature |
|---|---|---|---|---|
| Price band | Price on request | Price on request | Price on request | Price on request |
| Configurations | 108 apartments; 2 and 3 BHK per portal, to be confirmed | Apartments, mix to be confirmed | Apartments, mix to be confirmed | Apartments, mix to be confirmed |
| Possession | March 2031 (RERA completion) | 31 December 2029 (RERA proposed completion) | 31 March 2030 (RERA proposed completion) | December 2029 (RERA completion) |
| RERA status | PRM/KA/RERA/1251/446/PR/311026/009071 | PRM/KA/RERA/1251/309/PR/111126/009094 | PRM/KA/RERA/1251/446/PR/111126/009092 | PRM/KA/RERA/1251/446/PR/080926/008921 |
| Locality | Horamavu Agara | Horamavu, Hennur Road | Horamavu, K R Puram | Horamavu, Hennur Road |
None of the four publishes a price, so the comparison comes down to timing, scale and builder. Aura has the latest date of the group but the largest community.
What are the honest risks, and what should you check before booking?
Four risks stand out. The completion date is more than four years away. The builder's earlier delivery is unverified. Configuration and amenity details come from a portal, not the RERA filing. And the name overlap with Aeris could cause document confusion. The positives are real too: a mid-sized community, an approved plan, and a suburb on the future airport metro line.
| # | Check before booking |
|---|---|
| 1 | Search PRM/KA/RERA/1251/446/PR/311026/009071 on rera.karnataka.gov.in and match promoter, survey numbers, 108 units and 31 March 2031. |
| 2 | Make sure every receipt and agreement carries the Aura registration number, not just the project name. |
| 3 | Get RERA-filed floor plans, carpet areas, the BHK mix and the amenities list. |
| 4 | Request a written, all-in cost sheet with GST, parking, deposits, corpus, stamp duty and registration. |
| 5 | Visit Shreevari Grandeur and ask residents about handover timing and the occupancy certificate. |
| 6 | Have a lawyer verify title and the plan GBA/BECC/0446/2025-26 for all four survey numbers. |
| 7 | Confirm payments are linked to construction milestones and check RERA quarterly progress updates. |
What do buyers ask most about Shree Vari Aura?
What is the price of Shree Vari Aura?
The price is on request and no price list has been published as of November 2026. Ask for a full cost sheet before comparing.
Is Shree Vari Aura RERA registered?
Yes, under PRM/KA/RERA/1251/446/PR/311026/009071, dated 31 October 2026. Verify it on rera.karnataka.gov.in.
What BHK options does Shree Vari Aura have?
A listing portal shows 2 and 3 BHK homes of about 1,162 to 1,733 sq ft. Confirm this against the RERA-filed plans.
When is possession at Shree Vari Aura?
The declared RERA completion date is 31 March 2031.
What is the PropNewz verdict on Shree Vari Aura?
Shree Vari Aura is a RERA-registered, plan-approved, mid-sized apartment project in a Horamavu pocket that should benefit when the airport metro line opens. Against that, you are waiting until 2031, buying without a published price or RERA-confirmed unit mix, and relying on a small developer whose past deliveries you need to check yourself. It works for a patient East Bengaluru end user who visits the builder's earlier project, insists on registration-number-matched paperwork, and negotiates a milestone-linked plan. Buyers who want an earlier date from the same builder should look at Aeris first.
This review reflects information available as of November 19, 2026.
Talk to PropNewz to evaluate this project. Let's chat.
By PropNewz Team
Contact Us
Stay updated with latest news and new projects!
Tell us what you want, We'll do the rest.
Share your budget and where you're looking. An advisor who has actually walked the sites will shortlist a handful of RERA-registered projects and tell you which to skip.