Blog /
Projects

Apartments in Kudlu Compared: 3 Projects on Price, Possession and RERA

Three Kudlu apartment projects compared: all RERA registered, entry prices from Rs 1.20 Cr to Rs 2.47 Cr, possession from February 2027 to 2030.

Projects
Updated on
November 25, 2026
12 min read

Kudlu Gate stopped being just a traffic junction on 10 August 2025, when its Yellow Line metro station opened between Hongasandra and Singasandra on Hosur Road. Fifteen months later, three apartment projects listed in Kudlu ask a buyer to choose between a small, nearly finished block and two tall towers that will not be ready before 2030.

This comparison sets out those three apartment projects in Kudlu, Bangalore side by side as of November 2026. All three carry a K-RERA number, which makes this one of the cleaner sets on the PropNewz map, but their prices, sizes and timelines barely overlap. Every figure below comes from the PropNewz project pages as of the run date.

The short answer. Three apartment projects are compared, and all three are RERA registered. Entry prices run from Rs 1.20 Cr at Abhee Riviera Royale to Rs 2.47 Cr at Assetz Mizumi Reserve, with CKPC Heart of Harmony at Rs 2.43 Cr. Possession runs from February 2027 at Abhee Riviera Royale to December 2030 onwards at Assetz Mizumi Reserve. A buyer who wants the earliest handover and the lowest ticket fits Abhee Riviera Royale; a buyer who wants larger 3 and 4 BHK homes in a single high-rise tower near Kudlu Gate looks at CKPC Heart of Harmony; a buyer who wants a phase of a large master plan looks at Assetz Mizumi Reserve. The biggest trade-off is time against size: the earliest possession comes with the smallest homes in the set.

All three projects carry a K-RERA number, so the at-a-glance table separates them mainly on status, possession and starting price.

ProjectBuilderStatusRERAPossessionConfigurationsPrice from
Abhee Riviera RoyaleAbhee VenturesUnder ConstructionPRM/KA/RERA/1251/310/PR/210324/006722February 20272 BHK, 3 BHKRs 1.20 Cr onwards
CKPC Heart of HarmonyCKPC PropertiesUpcomingPRM/KA/RERA/1251/310/PR/310326/008560March 20303 BHK Classic, 3 BHK Premium, 3 BHK + Study Luxe, 4 BHK GrandeRs 2.43 Crore Onwards
Assetz Mizumi ReserveAssetz Property GroupUpcomingPRM/KA/RERA/1251/310/PR/040226/008450December 2030 onwards3 BHK + 3T, 4 BHK + 4TRs 2.47 Cr onwards

Which apartment projects in Kudlu are compared, and how was the set chosen?

Three projects are compared: Abhee Riviera Royale, CKPC Heart of Harmony and Assetz Mizumi Reserve. They are every apartment project listed in the Kudlu locality on PropNewz that has at least three comparable metrics on its page. A fresh update to the Abhee Riviera Royale page in the last three days triggered this comparison.

Assetz Mizumi Reserve has two pages on PropNewz with the same K-RERA number. They describe one development, so it appears once here, using the page that describes Phase 1. All listings are on the Kudlu locality page, and the wider apartments category on PropNewz covers the rest of the city.

How do prices compare across Kudlu apartments?

Entry prices split into two bands. Abhee Riviera Royale starts from Rs 1.20 Cr, while CKPC Heart of Harmony starts from Rs 2.43 Cr and Assetz Mizumi Reserve from Rs 2.47 Cr, roughly double the Abhee figure.

The price per sq ft column stays empty of figures for a stated reason: PropNewz computes it only when a stated entry price and a single super built-up size describe the same home, and no project here meets that test.

ProjectConfigurationsSize range (sq ft, super built-up)Price rangeIndicative price per sq ft (entry home)
Abhee Riviera Royale2 BHK, 3 BHK1,205 to 1,875Rs 1.20 Cr onwardsnot computed
CKPC Heart of Harmony3 BHK Classic, 3 BHK Premium, 3 BHK + Study Luxe, 4 BHK Grande1,786 to 2,572Rs 2.43 Cr to Rs 3.81 Cr (from unit prices; the price range field states Rs 2.43 Cr to Rs 3.64 Cr)not computed
Assetz Mizumi Reserve3 BHK + 3T, 4 BHK + 4T1,901 to 2,476Rs 2.47 Cr to Rs 3.39 Crnot computed

Two inconsistencies on the project pages are worth knowing. CKPC Heart of Harmony states a price range up to Rs 3.64 Cr, but its 4 BHK Grande is listed at Rs 3.64 Cr to Rs 3.81 Cr, so the table uses the unit prices and says so. Assetz Mizumi Reserve starts from Rs 2.47 Cr, yet the lowest unit price on its page is Rs 2.56 Cr for a 1,901 sq ft 3 BHK; ask Assetz which home the lower figure refers to.

What the price gap buys is mostly size and timing rather than location. The Rs 1.20 Cr entry at Abhee Riviera Royale buys a 2 BHK in a low-rise block that should be ready in early 2027. The Rs 2.43 Cr and Rs 2.47 Cr entries at the other two buy a 3 BHK of at least 1,786 sq ft in a tower of more than 20 floors, but with possession about three years later. A buyer comparing them should set the extra rent or EMI overlap of a 2030 handover against the larger home.

How do sizes and configurations compare?

Abhee Riviera Royale is the only project offering 2 BHK homes, at 1,205 and 1,300 sq ft, alongside 3 BHK homes of 1,505 to 1,875 sq ft. The other two start at 3 BHK. CKPC Heart of Harmony runs from a 1,786 sq ft 3 BHK Classic to a 4 BHK Grande of 2,550 to 2,572 sq ft, and Assetz Mizumi Reserve offers two 3 BHK sizes of 1,901 and 2,165 sq ft and a 4 BHK of 2,476 sq ft.

All sizes are super built-up. Our guide to carpet area versus super built-up area explains how much of each figure you can expect to live in.

Which Kudlu projects are RERA registered, and when does possession fall?

All three projects carry a K-RERA registration number on their project pages, so none needs the pre-registration caution that applies elsewhere. The registration numbers appear in full in the first table.

Possession is where they diverge most. Abhee Riviera Royale lists February 2027 and is already under construction. CKPC Heart of Harmony lists March 2030, and Assetz Mizumi Reserve lists December 2030 onwards, both as Upcoming projects. Our checklist of the documents on a RERA filing shows where to find the registered completion date for each.

How do scale, density and amenities compare?

Assetz Mizumi Reserve is the largest by far, with 440 homes in Phase 1, while Abhee Riviera Royale is the smallest at 96. Units per acre is computed by PropNewz where the land and unit figures parse cleanly.

ProjectLand areaTowers or blocksFloorsUnitsUnits per acre
Abhee Riviera Royale1.75 Acres1 towerG+49654.9 (computed)
CKPC Heart of Harmony1.7 Acres1 Tower2B + G + 24 Floors137 Units80.6 (computed)
Assetz Mizumi Reserve25 acres (Phase 1), part of an 80-acre master development3 towers (2B + G + 21 floors)Ground plus 21 floors with two basement levels440 units (Phase 1)not computed

CKPC Heart of Harmony computes to 80.6 units per acre against 54.9 at Abhee Riviera Royale, which reflects a 24-floor tower on a plot almost the same size as the Abhee site. The Assetz density is not computed because its land figure is a phase within a larger plan.

None of the three pages lists amenities in the structured amenities field, so a like-for-like amenity comparison is not possible from the project pages. Ask each builder for the clubhouse area and the list of facilities in writing before you compare. A single-tower project such as CKPC Heart of Harmony may carry its amenities on a podium or terrace, while a phased campus such as Assetz Mizumi Reserve may build some facilities only in later phases, so ask when each facility will open.

How do the locations differ within Kudlu, and what changed recently?

The three projects sit in different corners of Kudlu. CKPC Heart of Harmony is on Hosur Road at Kudlu Gate, Abhee Riviera Royale is on the HSR Layout side near VGP Layout, and Assetz Mizumi Reserve is at Sai Meadows in Parappana Agrahara, off Hosa Road.

The change that matters most is the Kudlu Gate metro station, which according to its station record opened on 10 August 2025 on the Yellow Line between Hongasandra and Singasandra. PropNewz has not verified walking or road distances from each project to the station, so none are printed.

For neighbouring options, see the PropNewz comparisons of apartments in Singasandra and apartments in Bellandur.

What are the trade-offs of each Kudlu project?

Abhee Riviera Royale

Abhee Riviera Royale is a single block of G+4 with 96 homes on 1.75 acres off the HSR Layout side of Kudlu, marked Under Construction with possession in February 2027. Its clearest strengths are the lowest entry price in the set, from Rs 1.20 Cr, and the earliest handover by more than three years. The trade-offs are scale and disclosure: it is the smallest campus, lists no amenities on its page, and does not break out prices by configuration. See the full Abhee Riviera Royale review.

CKPC Heart of Harmony

CKPC Heart of Harmony places 137 homes in one tower of 2B+G+24 floors on 1.7 acres at Kudlu Gate on Hosur Road, the only address in the set that names Kudlu Gate. Its strength is the widest and most fully priced menu of large homes, from a 1,786 sq ft 3 BHK at Rs 2.43 Cr to a 4 BHK of up to 2,572 sq ft. The trade-offs are a March 2030 possession and the highest computed density in the set. See the full CKPC Heart of Harmony review.

Assetz Mizumi Reserve

Assetz Mizumi Reserve is Phase 1 of a larger Assetz development at Sai Meadows, Parappana Agrahara, off Hosa Road: 440 homes in three towers of 2B+G+21 on 25 acres. Its strength is the land around it, with Phase 1 alone covering 25 acres. The trade-offs are the longest wait in the set, December 2030 onwards, and a starting price of Rs 2.47 Cr that sits above the lowest unit price the page lists. A second PropNewz page for the same project, Assetz Mizumi Reserve (Kudlu), cites the whole 80-acre, 1,400-home plan. See the full Assetz Mizumi Reserve review.

Which Kudlu project suits which buyer?

Each project answers a different need, and the trade-off attached to each is as real as its strength.

Buyer needProject that fitsWhy (the metric behind it)Trade-off to accept
Lowest entry priceAbhee Riviera RoyaleFrom Rs 1.20 Cr, against Rs 2.43 Cr and Rs 2.47 Cr for the other twoSmallest campus, 96 homes in a single G+4 block; no amenities listed on the page
Earliest possessionAbhee Riviera RoyaleUnder Construction with February 2027 possession, more than three years ahead of the othersPer-home prices are not broken out by configuration on the page
Largest homesCKPC Heart of Harmony4 BHK Grande of 2,550 to 2,572 sq ft super built-up, the largest stated size in the setPossession March 2030 and the highest computed density at 80.6 units per acre
Wide choice of 3 BHK formatsCKPC Heart of HarmonyThree 3 BHK variants from 1,786 to 2,189 sq ft, priced from Rs 2.43 Cr to Rs 3.20 CrSingle tower of 2B+G+24 floors, so lift and common-area load sits on one core
Phase of a larger master planAssetz Mizumi ReservePhase 1 of 440 homes on 25 acres within an 80-acre master developmentPossession December 2030 onwards, and later phases will keep construction going around early towers

What should you check before booking an apartment in Kudlu?

These seven checks cover the registration, the sizes and the price gaps that the project pages leave open.

#Check to run before booking
1Search the K-RERA portal for each registration number and confirm the promoter, the registered completion date and the land area covered by that registration.
2Ask for the carpet area of the exact unit in writing, since all three pages state super built-up area.
3For Abhee Riviera Royale, ask for a configuration-wise price sheet, since the page gives only a starting figure of Rs 1.20 Cr.
4For CKPC Heart of Harmony, confirm the final price of the 4 BHK, since the page states both Rs 3.64 Cr and Rs 3.81 Cr as upper figures.
5For Assetz Mizumi Reserve, confirm which towers and acreage fall under the Phase 1 registration, and how later phases will be accessed during construction.
6Compare the payment schedule against construction stages and the agreement for sale on the RERA filing.
7Before possession, ask for the occupancy certificate and confirm maintenance charges and the corpus deposit in writing.

What is the lowest entry price for an apartment in Kudlu?

The lowest stated entry price in this set is Rs 1.20 Cr at Abhee Riviera Royale, an under-construction project with 2 BHK and 3 BHK homes. CKPC Heart of Harmony starts from Rs 2.43 Cr and Assetz Mizumi Reserve from Rs 2.47 Cr, both for 3 BHK homes of at least 1,786 sq ft.

Which Kudlu project has the earliest possession?

Abhee Riviera Royale has the earliest possession, listed as February 2027, and is already under construction. CKPC Heart of Harmony lists March 2030 and Assetz Mizumi Reserve lists December 2030 onwards. Confirm each date against the registered completion date on the Karnataka RERA portal before you commit to a booking.

Are the Kudlu apartment projects RERA registered?

Yes. All three projects in this comparison show a K-RERA registration number on their PropNewz pages: Abhee Riviera Royale, CKPC Heart of Harmony and Assetz Mizumi Reserve. Search each number on the Karnataka RERA portal to confirm the promoter, the registered land area and the completion date before paying a booking amount.

What should I verify before booking an apartment in Kudlu?

Verify the K-RERA registration, the registered completion date and the land area it covers. Get the carpet area of your exact unit in writing, ask for a configuration-wise price sheet where the page gives only a starting figure, and before possession confirm the occupancy certificate, maintenance charges and corpus deposit.

This comparison reflects information available as of November 25, 2026.

Talk to PropNewz to compare these projects for your budget. Let's chat.

By PropNewz Team

Contact Us

Stay updated with latest news and new projects!

Thank you! Your submission has been received, We'll get back in touch with you shortly.
Oops! Something went wrong while submitting the form.
No pressure, ever

Tell us what you want, We'll do the rest.

Share your budget and where you're looking. An advisor who has actually walked the sites will shortlist a handful of RERA-registered projects and tell you which to skip.

We only contact you about projects you ask about
No spam, no reselling your number, unsubscribe anytime
Independent advice we're paid the same whoever you pick
Thank you! Your submission has been received, We'll get back in touch with you shortly.
Oops! Something went wrong while submitting the form.