Blog /
Projects

The Clan Review: Sarjapur Road 2 and 3 BHK Homes Assessed

Large 2 and 3 BHK homes from Rs 97.5 lakh with RERA in place, but the outer Sarjapura location means long commutes until metro arrives.

Projects
Updated on
November 16, 2026
12 min read

On October 12, 2026, Bengaluru's development minister gave officials fifteen days to ease the junctions around the Dommasandra flyover, a structure that has been under construction for eight years and is still more than half unfinished, according to OneIndia. Anyone who drives Sarjapur Road knows that story. It is also the backdrop for The Clan, a 257-home building by Global Edifice Infra at the far end of the corridor in Sarjapura town, where prices start under Rs 1 crore and possession is filed for December 2028.

Short answer: The Clan offers 2, 2.5 and 3 BHK apartments of 1,289 to 1,826 sq ft at Rs 97.5 lakh to Rs 1.37 crore (October 2026 price list) on Bagalur Road, Sarjapura. It is RERA registered under PRM/KA/RERA/1251/308/PR/091025/008153 with completion in December 2028. The biggest trade-off is distance: you get larger homes for the money, but you are about 11.6 km in a straight line from the Carmelaram tech cluster, with no metro yet.

What is The Clan and who is it built for?

The Clan is a single mid-rise apartment project of 257 homes on 3.5 acres, rising to two basements, ground and nine floors. Global Edifice Infra markets it on privacy and space: the builder says 60 percent of the land is open, that no two homes share a common wall, and that every unit has two balconies. Those are builder claims, so check them against the sanctioned plan.

The product is aimed at families who want a genuine 3 BHK at a price that buys a compact 2 BHK closer to the city. Buyers who work in Sarjapura, at the industrial belt toward Attibele, or who expect to work at the planned SWIFT City campus will find the location practical. Daily commuters to Outer Ring Road will find it a stretch.

Who is Global Edifice Infra and what is its track record?

Global Edifice Infra is a small Bengaluru developer whose work is concentrated around Chandapura and Anekal, not a listed or widely known brand. RERA aggregator records show Green Apple in Chandapura with a completion date of September 30, 2019, and Global Edifice Cresent in Anekal with a completion date of August 5, 2025.

That is a modest record for a 257-unit build with two basements. Do more of your own diligence: visit a delivered project, speak to residents about handover, and ask which bank holds the project escrow account.

Where is The Clan and how is the connectivity?

The Clan is on Bagalur Road in Sarjapura, pin code 562125, at the outer end of the Sarjapur Road micro market. By our estimate from map coordinates, it is about 11.6 km in a straight line from RGA Tech Park at Carmelaram, and the road distance is longer. The site is closer to Sarjapura town, Attibele and the Hosur Road industrial belt than to Bellandur or Whitefield.

The infrastructure picture is mixed. The Hebbal to Sarjapur Red Line metro, which the builder cites as a selling point, has had its target completion pushed to April 2033 and still awaits central approval, as Construction World reported in July 2026. Closer to the city, the Blue Line on Outer Ring Road began trial runs on November 10, 2026 and is targeted for public use in May 2027, per Asianet Newsable; that helps commuters who can reach Iblur or Agara stations, but it does not reach Sarjapura. The Satellite Town Ring Road and SWIFT City, also cited by the builder, are partly built or proposed, so treat them as upside, not certainty.

What homes, sizes and amenities does The Clan offer?

The Clan has four layouts. The 2 BHK with two baths runs 1,289 to 1,451 sq ft, the 2.5 BHK is about 1,537 sq ft, the 3 BHK with two baths is 1,478 to 1,572 sq ft, and the 3 BHK with three baths is 1,647 to 1,826 sq ft. These sizes are generous for the price band.

A full amenity list was not on the project page, so ask for the clubhouse size, pool and gym details in writing. Note that listing portals quote sizes as small as 1,131 sq ft, so confirm whether each figure is super built-up or carpet area before comparing projects.

What does a home at The Clan really cost?

The Clan's October 2026 price list ranges from Rs 97.5 lakh for the smallest 2 BHK to Rs 1.37 crore for the largest 3 BHK, excluding stamp duty and registration. The quoted base rate is Rs 6,250 per sq ft. By configuration, the 2 BHK is Rs 97.5 lakh to Rs 1.08 crore, the 2.5 BHK about Rs 1.14 crore, the 3 BHK two-bath Rs 1.1 crore to Rs 1.17 crore and the 3 BHK three-bath Rs 1.22 crore to Rs 1.37 crore.

Simple arithmetic shows the list prices already bundle more than base cost: 1,289 sq ft at Rs 6,250 is about Rs 80.6 lakh. The builder's charge sheet adds car parking at Rs 3 lakh or Rs 5 lakh, an amenities charge of Rs 3 lakh, power backup of Rs 1 lakh, a location premium of Rs 100 per sq ft, floor rise of Rs 50 per sq ft per floor from the second floor, a maintenance deposit and a sinking fund of Rs 64,450 or Rs 91,300 each, and Rs 50,000 for khata and legal work. Water and power connection charges are "as applicable".

On top of that, GST at 5 percent applies to under-construction homes, and in Karnataka stamp duty with cess and surcharge of about 5.6 percent plus 1 percent registration brings the government cost to roughly 6.6 percent for property above Rs 45 lakh. Ask the builder which of these items are already inside the Rs 97.5 lakh figure so you do not count them twice.

Is The Clan RERA approved and when is possession?

The Clan is registered with Karnataka RERA under PRM/KA/RERA/1251/308/PR/091025/008153, and the project page lists its approval status as approved.

The committed completion date is December 2028, per the October 2026 inventory update. Some listing portals quote a builder target of October or December 2027; treat those as indicative. We did not pull the record directly from rera.karnataka.gov.in for this review, so verify the declared completion date, promoter entity and land extent yourself before you pay.

How does The Clan compare with nearby projects?

The Clan is among the cheaper RERA-registered options in this corridor per sq ft, mostly because of its outer location. Closer to Chikka Tirupathi Road, Modern Spaaces Neon lists Rs 90 lakh to Rs 1.25 crore but with a later RERA date. Modern Spaaces Green Storeys and DSR The Courtyard in Gunjur sit in a similar budget with earlier dates. Buyers willing to stretch toward Rs 1.4 crore and above could also look at Mana Capitol beside RGA Tech Park.

DimensionThe ClanModern Spaaces NeonModern Spaaces Green StoreysDSR The Courtyard
Price bandRs 97.5 L to Rs 1.37 CrRs 90 L to Rs 1.25 CrRs 1.1 Cr to Rs 1.5 CrRs 1.08 Cr to Rs 1.74 Cr
Configurations2, 2.5 and 3 BHKTo be confirmedTo be confirmedTo be confirmed
PossessionDecember 2028Dec 2029 onwards (RERA: Dec 2030)July 2027 (RERA: Dec 2026)February 2027 (RERA)
RERA statusRegistered, 008153Registered, 007897Registered, 007394Registered, 006759
Distance to RGA Tech ParkAbout 11.6 km straight lineTo be confirmedTo be confirmedTo be confirmed

What are the risks and trade-offs at The Clan?

The main risk is commute time. Sarjapur Road traffic is heavy, the Dommasandra flyover remains unfinished, and the metro that would change the location's economics is now a 2033 story at the earliest. If your office is on Outer Ring Road, budget for long drives for years.

The second risk is builder scale. A small developer with two RERA-recorded completions is taking on a 257-unit build with two basement levels, so construction pace is worth monitoring through the quarterly RERA updates. Third, the cost stack runs to roughly ten separate charges. Finally, the market is soft at the edges: ANAROCK data reported by Business Today on September 29, 2026 showed Bengaluru sales of about 16,670 homes in the July to September quarter, up 12 percent year on year, but launches are also rising, which gives buyers room to negotiate.

#Check before booking
1Search PRM/KA/RERA/1251/308/PR/091025/008153 on rera.karnataka.gov.in and match promoter, extent and completion date.
2Get a written all-in cost sheet covering parking, amenities, power backup, PLC, floor rise, deposits and GST.
3Confirm whether your quoted price is on super built-up or carpet area, and get the carpet area in the agreement.
4Ask for the title documents, conversion order and khata status, and have a lawyer review them.
5Check the floor rise and PLC applicable to your exact unit, since both are charged per sq ft.
6Drive the route to your office at 9 am on a weekday, through Dommasandra if that is your path.
7Read the cancellation clause; 2 percent of sale value plus taxes is deducted before agreement.

What do buyers most often ask about The Clan?

What is the price of The Clan on Sarjapur Road?

The Clan is priced from Rs 97.5 lakh to Rs 1.37 crore as per the October 2026 developer price list, excluding stamp duty and registration. The quoted base rate is Rs 6,250 per sq ft. Car parking, amenities, power backup, floor rise and location premiums are charged extra, so ask for an all-in cost sheet before booking.

Is The Clan RERA registered?

Yes. The Clan is registered with Karnataka RERA under PRM/KA/RERA/1251/308/PR/091025/008153, and the project page lists its approval status as approved. Before paying any booking amount, search this number on rera.karnataka.gov.in and match the promoter name, land extent, unit count and declared completion date against your sale documents.

When is possession at The Clan?

The stated completion for The Clan is December 2028, based on the October 2026 inventory update and the RERA filing. Some listing portals quote an earlier builder target of late 2027, which is indicative only. Treat December 2028 as the committed date and check the RERA portal for any change.

What is the track record of Global Edifice Infra?

Global Edifice Infra is a smaller Bengaluru developer active mainly around Chandapura and Anekal. RERA aggregator records show Green Apple in Chandapura with a 2019 completion date and Global Edifice Cresent in Anekal with an August 2025 completion date. Visit a finished project and speak to residents before you commit.

What is the PropNewz verdict on The Clan?

The Clan is a reasonable value pick for end users who want space under Rs 1.4 crore and whose life is centred on Sarjapura or the southern industrial belt. The homes are large for the money, the RERA registration is in place and the December 2028 date is not aggressive. It is a weaker fit for Outer Ring Road commuters and for investors counting on the metro. Insist on an all-in cost sheet, verify the RERA record yourself and visit a completed Global Edifice project before you book.

This review reflects information available as of November 16, 2026.

Talk to PropNewz to evaluate this project. Let's chat.

By PropNewz Team

Contact Us

Stay updated with latest news and new projects!

Thank you! Your submission has been received, We'll get back in touch with you shortly.
Oops! Something went wrong while submitting the form.
No pressure, ever

Tell us what you want, We'll do the rest.

Share your budget and where you're looking. An advisor who has actually walked the sites will shortlist a handful of RERA-registered projects and tell you which to skip.

We only contact you about projects you ask about
No spam, no reselling your number, unsubscribe anytime
Independent advice we're paid the same whoever you pick
Thank you! Your submission has been received, We'll get back in touch with you shortly.
Oops! Something went wrong while submitting the form.