Sri Sai Nandana Arise Review: New Apartment Launch at Neraluru, Attibele
A RERA-registered 178-home launch near Attibele. Suits local workers, but a 2031 date, no price list and an unknown promoter raise the risk.
In August 2026, the Karnataka government cleared the preparation of a detailed project report for a 10.5 km Yellow Line metro extension from Bommasandra to Attibele, with nine stations proposed along Hosur Road, OneIndia reported. No construction date was given. Ten weeks later, on 30 October 2026, a 178-apartment project called Sri Sai Nandana Arise was registered with Karnataka RERA at Neraluru, a village in Attibele Hobli. Its declared completion date is the last day of 2031, which tells you this is a long bet on a corridor that is still being planned.
The short answer: Sri Sai Nandana Arise is a new launch of 178 apartments on 2.33 acres at Neraluru, Attibele, approved by the Anekal Planning Authority and registered on Karnataka RERA as PRM/KA/RERA/1251/308/PR/301026/009058, with completion declared for December 2031. Pricing is on request, and the RERA list gives no BHK mix or carpet areas. It may suit a patient buyer working along Hosur Road or in the Attibele and Bommasandra industrial belts. The biggest trade-off is a five-year wait with a promoter that has no visible track record.
What is Sri Sai Nandana Arise and who is it for?
Sri Sai Nandana Arise is an apartment project of 178 homes on 2.33 acres at Survey Nos 242/1 and 242/4, Neraluru Village, Attibele Hobli, Anekal taluk, Bengaluru Urban (PIN 562107). That is about 76 homes per acre by PropNewz arithmetic, typical of a mid-rise or high-rise project with limited open ground. RERA lists it as a new project launch, and PropNewz shows it as upcoming.
The natural buyer works south of Electronic City: in the Bommasandra, Jigani, Chandapura or Attibele industrial areas, or across the border towards Hosur. For that buyer, a home in Neraluru can mean a short commute rather than a daily crawl along Hosur Road. It is a weaker fit for someone commuting to central Bengaluru, Whitefield or the Outer Ring Road, and for anyone who needs a home before 2032.
Who is the promoter, and what is its track record?
The promoter on the RERA record is Sri Sai Nandana Builders, and PropNewz lists this as its only project. We found no website, completed projects or news coverage for the promoter. The RERA record also shows that it is a separate entity from Sri Nandana Infra, which registered two projects at Andapura on the same day, so do not assume a link between the two names.
A 178-unit tower project is a serious undertaking for a promoter without a visible history. Before you book, search the name on rera.karnataka.gov.in, ask who the partners or directors are and what they have built before, ask who the main contractor is, and ask how construction will be funded. If a bank has sanctioned a project loan, that is a useful signal; ask which one. A lawyer's title opinion on the survey numbers and the katha is essential.
Where is Sri Sai Nandana Arise, and how is connectivity?
The project is in Neraluru, a village in Anekal taluk that sits within about 5 km of both Attibele and Chandapura, per its Wikipedia entry. The RERA record carries no location pin, so ask for the exact site and visit it.
Today, road connectivity runs through Hosur Road (NH 44) towards Electronic City and the city, and via the Attibele and Sarjapura roads to the east. The Yellow Line currently ends at Bommasandra; the proposed Attibele extension would add stations at Chandapura, Attibele Industrial Area and Attibele itself, but it is only at the DPR stage, and the same report flagged unresolved questions about linking with a Tamil Nadu metro from Hosur. Do not price that extension into your decision yet. PropNewz has not measured distances or travel times from the site; test your commute at peak hours before you decide.
What homes are on offer, and what will living here be like?
The RERA list confirms 178 apartments but does not give the BHK mix, carpet areas, tower count or floor count. Ask the promoter for sanctioned floor plans and the carpet area of every unit type, and compare projects on price per sq ft of carpet area rather than super built-up area.
At this scale, expect a modest clubhouse and basic amenities rather than a township. In an area still urbanising, the questions that decide daily life are practical: whether BWSSB or another piped water source will reach the site or whether it will depend on borewells and tankers, how sewage will be treated, the power backup capacity, parking allotment and the condition of the approach road. Visit after rain to see how the approach handles water.
What will Sri Sai Nandana Arise really cost?
No price list has been published as of November 2026, so PropNewz shows no estimate. For context, Shriram Codename The One in Anekal listed about Rs 7,696 per sq ft in its August 2026 price list, but that is a different product from a branded developer and should not be read as this project's price.
Ask for a cost sheet that separates the basic rate, car parking, utility deposits, clubhouse charges, the corpus fund and the maintenance advance. Then add GST at 5 percent for under-construction apartments outside the affordable category (no input tax credit), Karnataka stamp duty of about 5.6 percent including cess and surcharge on property above Rs 45 lakh, and a registration fee of 2 percent (doubled from 1 percent in August 2025), about 7.6 percent in all for duty and registration; confirm current rates on the Kaveri portal. If the unit qualifies as affordable housing under GST rules, the rate is lower; ask the promoter to show the basis in writing.
What is the RERA, approval and possession position?
Sri Sai Nandana Arise is registered with Karnataka RERA under PRM/KA/RERA/1251/308/PR/301026/009058, dated 30 October 2026, with a declared completion date of 31 December 2031. This RERA ID is from the PropNewz project page; verify it on rera.karnataka.gov.in before paying.
The plan was approved by the Anekal Planning Authority under Plan No. CC/512 2026-27 on 3 September 2026. The address carries a katha number and an EPID, which suggests the land is recorded with the local body; ask for those documents and have your lawyer check them. As a new launch, expect little or no construction on site. A completion date five years out is long even for a project of this size.
How does Sri Sai Nandana Arise compare with nearby options?
The fair comparison is with apartment projects in the Attibele, Anekal and Chandapura belt. Shriram Codename The One in Anekal and SNN Highgarden in Chandapura have published rates, and NVT Lakeside Residences is another upcoming Attibele project.
| Dimension | Sri Sai Nandana Arise | Shriram Codename The One | SNN Highgarden | NVT Lakeside Residences |
|---|---|---|---|---|
| Price band | Price on request | Rs 7,696 per sq ft (August 2026 price list) | Rs 7,850 per sq ft (August 2026 price list) | Rs 1.80 crore onwards |
| Configurations | 178 apartments (mix to be confirmed) | Apartments | Apartments | Apartments |
| Possession | December 2031 (RERA) | April 2030 | December 2025 (listed date; to be confirmed) | 2030 onwards (tentative) |
| RERA status | Registered, PRM/KA/RERA/1251/308/PR/301026/009058 | Registered, PRM/KA/RERA/1251/310/PR/120625/007819 | Registered, PRM/KA/RERA/1251/308/PR/140622/004983 | To be confirmed |
| Locality | Neraluru, Attibele | Anekal | Chandapura | Attibele |
Sri Sai Nandana Arise competes on location for local workers; the others offer either a known brand or a published price.
What are the honest risks and trade-offs?
The first risk is the promoter: no track record, no website and no coverage. The second is time. December 2031 is more than five years away, and launch-stage projects carry the most execution risk. The third is information: price, unit mix and carpet areas are all missing. The fourth is infrastructure. The metro extension is a plan, not a project under construction, and civic services in villages around Attibele often trail new towers. The upside is that early entry in a growing industrial corridor can be rewarded, but only if the building is delivered.
Before any money changes hands, work through this checklist.
| # | Check before booking |
|---|---|
| 1 | Search PRM/KA/RERA/1251/308/PR/301026/009058 on rera.karnataka.gov.in and match promoter, survey numbers, unit count and completion date. |
| 2 | Ask who the promoter's partners or directors are and what they have completed before. |
| 3 | Get a written, all-in cost sheet with carpet area, parking, GST, deposits, clubhouse, corpus and maintenance listed separately. |
| 4 | Obtain the Anekal Planning Authority approval (CC/512 2026-27), katha and EPID records, and a lawyer's title opinion. |
| 5 | Get sanctioned floor plans with BHK mix, carpet areas, tower and floor count. |
| 6 | Ask about water source, sewage treatment, power backup and the approach road, and visit after rain. |
| 7 | Ask which bank, if any, has sanctioned a project loan, and link payments to construction stages. |
What do buyers ask most about Sri Sai Nandana Arise?
What is the price of Sri Sai Nandana Arise?
The price is on request. No price list was published as of November 2026, and PropNewz shows no estimate. Ask for an all-in cost sheet.
Is Sri Sai Nandana Arise RERA registered?
Yes, under PRM/KA/RERA/1251/308/PR/301026/009058, registered on 30 October 2026, per the PropNewz project page. Verify it on rera.karnataka.gov.in.
When is possession at Sri Sai Nandana Arise?
The RERA-declared completion date is 31 December 2031. It is a new launch, so link your payments to construction stages.
Is there a metro near Sri Sai Nandana Arise?
Not yet. A Yellow Line extension from Bommasandra to Attibele is at the detailed project report stage, with no construction date announced.
What is the PropNewz verdict on Sri Sai Nandana Arise?
Sri Sai Nandana Arise has the paperwork basics in place: a RERA registration, an Anekal Planning Authority approval and a defined scale of 178 homes on 2.33 acres. It sits in a corridor with real employment and a metro extension on the drawing board. But it asks buyers to trust an unknown promoter for more than five years without a price, a unit mix or a carpet area to judge. For local workers who can verify the promoter's backers and get a fair all-in cost sheet, it may be worth a closer look. For most buyers, an established project nearby with a published price and earlier possession is the lower-risk choice.
This review reflects information available as of November 19, 2026.
Talk to PropNewz to evaluate this project. Let's chat.
By PropNewz Team