Signature CNR Marvel Review: 2, 3 and 4 BHK Apartments near Chandapura

An upcoming, RERA registered Chandapura launch from a known local builder; worth it only if the launch price beats more advanced nearby projects.

Projects
Updated on
November 19, 2026
12 min read

In August 2026, the Karnataka government approved preparation of a detailed project report for a 10.5 km extension of the Yellow Line from Electronic City to Attibele, with stations proposed at Chandapura Circle and Old Chandapura, according to Oneindia. Two months later, on 9 October 2026, Signature Dwellings registered a new 125-home apartment project a short way off that corridor at Marasuru Agrahara, Anekal. Signature CNR Marvel is an early launch in a micro-market that is pricing in a metro line that has not yet been designed in detail.

The short answer: Signature CNR Marvel is an upcoming RERA registered apartment project of 125 homes on 2 acres near Chandapura, by Signature Dwellings, with a declared completion date of 31 August 2029. No price list is published, so it is price on request; a portal lists 2, 3 and 4 BHK homes of about 1,246 to 1,775 sq ft. The plan is approved by the Satellite Town Ring Road Planning Authority. The biggest trade-off is time: you would commit nearly three years before handover, in a location whose metro upside is still on paper.

What is Signature CNR Marvel and who is it for?

Signature CNR Marvel is a new mid-density apartment project on converted land at Survey No. 13/5, Marasuru Agrahara Village, Kasaba Hobli, Anekal (PIN 562106), listed on PropNewz under Chandapura and Electronic City. With 125 homes on 2 acres, the density is about 62 homes per acre. It is listed on RERA as a new project launch, so it is at the very start of construction. It suits a first or second home buyer who works in Electronic City or along Hosur Road, wants a bigger home for the money than closer-in suburbs offer, and can wait until late 2029. It suits investors who need rental income soon, or anyone who needs a home within two years, less well. See the Signature CNR Marvel project page for the full record.

Who is the builder and what is their track record?

Signature Dwellings Private Limited is the promoter on the RERA record, and it has a visible local portfolio concentrated around Chandapura and Electronic City. PropNewz lists its Signature Heights project in Electronic City and notes that it also promotes Signature Regal at Marasuru Agrahara. A portal credits the developer with 11 projects, 7 of them delivered (Square Yards), a figure PropNewz has not verified. That is a more substantial record than many promoters in this belt, but it is a regional builder, not a listed national brand. Ask for completion certificates and handover dates on two or three past projects, and speak to residents there about construction quality and how snag lists were handled.

How well connected is the location?

The site sits in the Chandapura and Anekal belt south of Electronic City, and its daily connectivity runs almost entirely through Hosur Road (NH 44). Electronic City's offices are the nearest large employment cluster, and the Yellow Line metro now reaches Electronic City. The planned Attibele extension would add stations at Chandapura Circle and Old Chandapura, but as of the latest reporting it is at the detailed project report stage, with no construction timeline. Chandapura also has a railway junction on the Hosur line. Hosur Road traffic at the Chandapura junction is a well-known pinch point, so test your commute at peak hour. The RERA list carries no location pin, and one portal labels the locality differently, so ask for the exact coordinates of Survey No. 13/5 and visit before booking.

What homes are on offer and how will it feel to live there?

The RERA list confirms 125 apartments but gives no BHK mix or carpet areas. A portal listing shows a 2 BHK of about 1,246 sq ft, 3 BHK options of about 1,585 and 1,670 sq ft, and a 4 BHK of about 1,775 sq ft, all on a saleable basis, with amenities such as a children's play area, yoga space, jogging track, indoor games and a central green (Square Yards). Treat these as indicative until they appear in the agreement and the approved plan. Saleable area typically runs well above carpet area, so ask for the carpet figure and the loading percentage. On 2 acres with 125 homes, expect a compact community with modest shared space. Families who value a quieter, smaller society may like that; those who want a large clubhouse and sports facilities will find more in the bigger townships nearby.

What will it really cost once every charge is added?

Signature CNR Marvel has no published price list, so PropNewz shows price on request and gives no estimate. For context only, the same builder's Signature Heights in Electronic City carries a September 2026 price list of Rs 8,000 per sq ft on PropNewz, but a new launch in a different location may be priced differently. On top of the basic price, an under-construction apartment attracts GST of 5 percent without input tax credit, which is Rs 5 lakh on every Rs 1 crore. Stamp duty in Karnataka is about 5.6 percent including cess and surcharge for homes above Rs 45 lakh, plus a registration fee of 2 percent (doubled from 1 percent in August 2025), about 7.6 percent in all or roughly Rs 7.6 lakh per Rs 1 crore; confirm current rates on the Kaveri portal. The Hans India reported on 15 November 2026 that a guidance value revision of around 30 percent is being considered (The Hans India), which could push up registration costs for buyers who register later. Add car parking, utility deposits, clubhouse charges, the corpus fund and the maintenance advance, and insist that every item appears separately on the cost sheet.

What is the RERA and approval position, and when is possession?

Signature CNR Marvel is registered with Karnataka RERA under PRM/KA/RERA/1251/308/PR/091026/009008, dated 9 October 2026, with a RERA status of new project launch. The building plan was approved by the Satellite Town Ring Road Planning Authority under Plan No. STRRPA/TP/CC/195/2026-27/1235 on 18 August 2026. The declared completion date is 31 August 2029. Because the project is upcoming and construction has barely begun, the delivery risk sits entirely in the future. The RERA ID is from the PropNewz project page; verify it on rera.karnataka.gov.in and match the survey number, unit count and completion date with your agreement for sale. The RERA address describes the site as converted land, so ask for the land conversion order along with the title documents.

How does it compare with other projects nearby?

Two PropNewz listings help frame the decision: Signature Heights, the same builder's Electronic City project with a published rate, and SNN Highgarden in Chandapura.

DimensionSignature CNR MarvelSignature HeightsSNN Highgarden
Price bandPrice on requestRs 8,000 per sq ft (September 2026 price list)Rs 7,850 per sq ft (August 2026 price list)
ConfigurationsApartments, 125 units (2, 3 and 4 BHK per portal)ApartmentsApartments
PossessionAugust 2029 (RERA)October 2028December 2025 as listed (status under construction)
RERA statusRegistered, PRM/KA/RERA/1251/308/PR/091026/009008Registered, PRM/KA/RERA/1251/308/PR/111124/007220Registered, PRM/KA/RERA/1251/308/PR/140622/004983
LocalityMarasuru Agrahara, near ChandapuraElectronic CityChandapura

The pattern is clear. The older projects have published rates and earlier handovers, while CNR Marvel offers a later, unpriced entry. Unless its launch price undercuts these rates meaningfully, a buyer may be better served by a project that is further along. Note that SNN Highgarden's listed possession date has already passed while its status still reads under construction, so check its current progress before treating it as the safer option.

What are the honest risks and trade-offs?

The first trade-off is time. A completion date of August 2029 means about 33 months of EMI or pre-EMI alongside rent, and RERA extensions are common. The second is price discovery: with no published price, you cannot yet judge whether the launch rate is fair against nearby stock. The third is location ambiguity, since the RERA address, the PropNewz listing and a portal describe the locality three ways. The fourth is infrastructure: the Attibele metro extension may lift values eventually, but it is not funded for construction yet. Finally, density and amenity scale are modest, and the Chandapura stretch of Hosur Road remains congested.

Before booking, work through this checklist.

#Check before booking
1Verify PRM/KA/RERA/1251/308/PR/091026/009008 on rera.karnataka.gov.in and match survey number and completion date.
2Get a written cost sheet listing basic rate, parking, GST, deposits, club charges, corpus and maintenance.
3Ask for the land conversion order and title documents for Survey No. 13/5, Marasuru Agrahara.
4Confirm carpet area, BHK mix and floor count from the STRR Planning Authority approved plan.
5Visit two delivered Signature Dwellings projects and check completion certificates and handover dates.
6Pin the exact site location and drive the Hosur Road commute at peak hour.
7Confirm bank approvals and the construction-linked payment schedule in the agreement.

What do buyers ask most about Signature CNR Marvel?

What is the price of Signature CNR Marvel?

No price list has been published, so it is price on request. Ask for a written cost sheet and compare it with the same builder's published Electronic City rates.

Is Signature CNR Marvel RERA registered?

Yes. It is registered under PRM/KA/RERA/1251/308/PR/091026/009008, dated 9 October 2026, as a new project launch.

When is possession at Signature CNR Marvel?

The declared RERA completion date is 31 August 2029.

Who is building Signature CNR Marvel?

Signature Dwellings Private Limited, a Bangalore builder with several projects around Chandapura and Electronic City.

Is Signature CNR Marvel worth considering?

Signature CNR Marvel is worth a look for an Electronic City or Hosur Road based family that wants a larger home and is willing to wait until 2029 for it, especially given the builder's local portfolio. The approvals are in place on paper. The case against it is that you are paying for a future: an unpriced launch, a metro line still at report stage and a long build. If the launch price is clearly below what the builder's more advanced projects charge, the wait may be worth it. If not, an earlier-handover project is the better bet.

This review reflects information available as of November 19, 2026.

Talk to PropNewz to evaluate this project. Let's chat.

By PropNewz Team

Contact Us

Stay updated with latest news and new projects!

Thank you! Your submission has been received, We'll get back in touch with you shortly.
Oops! Something went wrong while submitting the form.
No pressure, ever

Tell us what you want, We'll do the rest.

Share your budget and where you're looking. An advisor who has actually walked the sites will shortlist a handful of RERA-registered projects and tell you which to skip.

We only contact you about projects you ask about
No spam, no reselling your number, unsubscribe anytime
Independent advice we're paid the same whoever you pick
Thank you! Your submission has been received, We'll get back in touch with you shortly.
Oops! Something went wrong while submitting the form.