Step out of Magadi Road station on the Purple Line, walk about 50 m, and you reach the gate of Purva Blubelle, according to Puravankara's own distance chart. In a city where most new launches sell metro access measured in kilometres, that is a rare claim. The price tells you the market knows it: the November 2026 price list starts at Rs 2.35 Cr for a 3 BHK of about 1,432 sq ft, roughly Rs 16,400 per sq ft, in a pocket of west Bengaluru most buyers still think of as old Magadi Road.

Short answer: Purva Blubelle is a K-RERA registered (PRM/KA/RERA/1251/310/PR/290323/005829) project of 3 BHK apartments on Magadi Road near Rajajinagar, from about Rs 2.35 Cr, with completion stated as June 2029. Metro access and a listed, experienced developer are the strengths. The single biggest trade-off is a high per sq ft price for a 3 BHK-only, high-density twin-tower project with a long and possibly revised timeline.

What is Purva Blubelle and who is it built for?

Purva Blubelle is a twin-tower high-rise of 378 homes on about 3.9 acres at Kempapura Agrahara, Magadi Main Road. The project page lists one basement, stilt and 31 to 32 floors, with the status as under construction. Every home is a 3 BHK, in two layouts.

Puravankara pitches it as a family-focused design, with 17 themed gardens, solar power, organic waste management, rainwater harvesting and low-VOC paints. The buyer it suits is a family already rooted in west or central Bengaluru, perhaps in Rajajinagar, Vijayanagar or Basaveshwaranagar, who wants a new branded apartment without moving to the periphery.

How strong is the track record of Puravankara?

Puravankara is a listed Bengaluru-based developer with a long record of delivered projects across the city under its Purva brand. Its latest quarter shows scale: Business Today reported on October 13, 2026 that Q2 FY27 pre-sales rose 62 percent to Rs 2,136 Cr, with collections of Rs 1,301 Cr and 977 homes handed over in the quarter.

That handover number is the more useful signal for a buyer, because it shows homes being completed, not just sold. Puravankara's Bengaluru pipeline is large, including Purva Park Hill in Mallasandra, which carries a declared K-RERA completion of 31 December 2027. Visiting a delivered Purva project is still the best way to judge finishing and maintenance.

How good is the location and connectivity of Purva Blubelle?

Connectivity is the headline. Puravankara lists Magadi Road Purple Line station at about 50 m, Hosahalli station at 1.8 km and Vijayanagar station at 2.6 km. The Purple Line runs east through Majestic, where it meets the Green Line, and on to MG Road and Whitefield, and west to Challaghatta.

Social infrastructure is already in place. The developer lists Gurukula International School at about 500 m, GT World Mall at 550 m, D-Mart at 1.1 km, Lulu Hypermarket at 2 km and Orion Mall at 5.5 km, with Chickpet about 3 km and Rajajinagar and Basaveshwaranagar about 2.9 km away. Further out, Namma Metro Phase 3 includes a 12.15 km corridor from Hosahalli to Kadabagere along Magadi Road, per a June 2026 Deccan Herald report. It starts about 1.8 km west of the site and is years away, so treat it as a long-term benefit for western Magadi Road rather than this address.

What homes, sizes and lifestyle does Purva Blubelle offer?

There is one configuration, the 3 BHK, in sizes of about 1,432 to 1,630 sq ft on the project page. Puravankara's page quotes 1,434 to 1,631 sq ft super built-up area across an L-type and an R-type layout. Ask for carpet area, since super built-up figures include a share of common areas and loading in high-rises can be significant.

At 378 homes on about 3.9 acres in two tall towers, this is a vertical, higher-density community than many suburban projects. The upside is views and a compact footprint that leaves room for gardens; the downside is lift waiting times at peak hours and more neighbours per tower. Amenities listed by the developer include a pool and cabana, gym, jogging track and party lawn alongside the themed gardens.

What will Purva Blubelle really cost, including charges?

The base price starts at about Rs 2.35 Cr per the November 2026 price list, excluding stamp duty and registration. An earlier Puravankara campaign page showed a starting figure of about Rs 2.28 Cr, so prices have moved, and the current figure should be confirmed in a written quote.

Other charges such as car parking, clubhouse, infrastructure, maintenance deposit, corpus and floor rise are not published for this project and are to be confirmed with the builder. What can be estimated: GST at 5 percent on an under-construction home adds about Rs 11.75 lakh on Rs 2.35 Cr. Karnataka stamp duty of roughly 6.6 percent including cess adds about Rs 15.5 lakh, and registration of about 1 percent adds roughly Rs 2.35 lakh. That is close to Rs 30 lakh before builder charges, so budget for an all-in figure well above Rs 2.6 Cr.

What is the RERA, approval and possession status of Purva Blubelle?

Purva Blubelle is registered with Karnataka RERA under PRM/KA/RERA/1251/310/PR/290323/005829, registered in March 2023, and the same number appears on Puravankara's page. The project page marks approvals as in place, and the project was launched in 2023, as reported by Realty Plus.

The stated completion is June 2029, per the November 2026 inventory update. At least one listing portal shows a RERA completion of October 2028, which suggests the declared date may have been extended. Check the current date and any extension on rera.karnataka.gov.in, and read the quarterly progress filings to see how far the towers have risen.

How does Purva Blubelle compare with nearby projects?

Within west and north-west Bengaluru, Purva Blubelle is the cheapest entry in this set, but not by as much per sq ft as the headline suggests. DNR Highline in Rajajinagar quotes a base of Rs 16,950 per sq ft, close to Blubelle's implied rate. Assetz 22 and Crest in Yeshwanthpur and Saibya Sanctuary offer different timelines.

DimensionPurva BlubelleDNR HighlineAssetz 22 and CrestSaibya Sanctuary
Price bandFrom Rs 2.35 CrRs 3.86 Cr to Rs 8.89 CrRs 2.28 Cr to Rs 3.38 Cr (indicative)To be confirmed
Configurations3 BHK3 BHK to 5 BHK duplexTo be confirmedTo be confirmed
PossessionJune 20291 October 2026 (stated, passed)From late 2026 (per listings)March 2030
RERA statusRegistered, PR/290323/005829Registered, PR/220118/004647Registered, PR/170915/000219Registered, PR/031126/009077
Distance to Magadi Road metroAbout 50 m (developer)To be confirmedTo be confirmedTo be confirmed

The comparison shows the real decision: Blubelle offers metro-side living at a lower ticket than DNR Highline, but you wait until 2029, while Assetz 22 and Crest may hand over much sooner at a similar entry price.

What are the honest risks and trade-offs at Purva Blubelle?

The first risk is price per sq ft. At roughly Rs 16,400 per sq ft at entry, you pay a central-Bengaluru rate for a Magadi Road address, so the metro premium is already priced in. The second is timeline: a 2023 registration with a 2029 completion and a possible extension means a long wait and EMI or rent overlap.

The third is format. A 3 BHK-only, two-tower high-rise limits resale buyers to one segment and concentrates residents in two lift cores. Finally, Magadi Road traffic and older surrounding stock mean the neighbourhood will not look as polished as the project for some years.

#Check before booking
1Search PRM/KA/RERA/1251/310/PR/290323/005829 on rera.karnataka.gov.in for the current completion date and any extension.
2Get a written quote confirming the Rs 2.35 Cr base and all builder charges.
3Ask for carpet area and loading percentage for your layout.
4Review the latest quarterly construction progress filed on the RERA portal.
5Walk from Magadi Road station to the site gate to verify the 50 m claim.
6Check lift count per tower and parking allotment in the agreement.
7Visit a delivered Purva project to assess finishing and maintenance.

What do buyers most often ask about Purva Blubelle?

What is the price of Purva Blubelle?

Purva Blubelle starts at about Rs 2.35 Cr for a 3 BHK, per the November 2026 developer price list, excluding stamp duty and registration. That works out to roughly Rs 16,400 per sq ft on the smallest 1,432 sq ft unit. GST, parking and other charges are not published and must be confirmed.

Where is Purva Blubelle and how is the connectivity?

Purva Blubelle is on Magadi Main Road at Kempapura Agrahara, near Rajajinagar in west Bengaluru, PIN 560023. Puravankara places Magadi Road Purple Line station about 50 m away and Hosahalli station about 1.8 km away. GT World Mall is about 550 m from the site, per the developer.

When is possession at Purva Blubelle?

The stated completion for Purva Blubelle is June 2029, per the November 2026 inventory update. One listing portal shows an earlier RERA date of October 2028, so the timeline may have been revised. Confirm the current completion date and any extension order on the Karnataka RERA portal before you book.

What is the track record of Puravankara?

Puravankara is a listed Bengaluru-based developer with decades of delivered projects across the city. In Q2 FY27 it reported pre-sales of Rs 2,136 Cr, up 62 percent, and handed over 977 homes in the quarter. Visit a delivered Purva project to judge build quality and maintenance yourself.

Is Purva Blubelle worth buying?

Purva Blubelle is worth shortlisting if a 3 BHK beside a Purple Line station, from a listed Bengaluru developer, is your top priority and you can wait until 2029. The location is genuinely rare. The price is not cheap for Magadi Road, though, and the timeline may have slipped once. Confirm the current RERA date and a full cost sheet before deciding whether the metro premium is worth paying.

This review reflects information available as of November 16, 2026.

Talk to PropNewz to evaluate this project. Let's chat.

By PropNewz Team

Contact Us

Stay updated with latest news and new projects!

Thank you! Your submission has been received, We'll get back in touch with you shortly.
Oops! Something went wrong while submitting the form.
No pressure, ever

Tell us what you want, We'll do the rest.

Share your budget and where you're looking. An advisor who has actually walked the sites will shortlist a handful of RERA-registered projects and tell you which to skip.

We only contact you about projects you ask about
No spam, no reselling your number, unsubscribe anytime
Independent advice we're paid the same whoever you pick
Thank you! Your submission has been received, We'll get back in touch with you shortly.
Oops! Something went wrong while submitting the form.