The BMRCL website says the area 11 metres on both sides of underground Namma Metro structures is a declared influence zone where a BMRCL NOC is mandatory, and lists Phase 3A from Sarjapura to Hebbal as an upcoming project with its detailed project report being prepared.

Buying Guides
Updated on
November 22, 2026
12 min read

11 metres. According to the influence zone page on the BMRCL website, that is the width of land on both sides of every underground Namma Metro structure that the Karnataka government has declared the Bengaluru Metro influence zone. Inside it, the page says, a no objection certificate from Bangalore Metro Rail Corporation Limited is mandatory before any activity is undertaken. For anyone buying a plot to build on, or a flat in a building that went up near an underground stretch, that one rule is worth understanding before signing.

This guide explains what the BMRCL website says about the influence zone, what it says about the next corridor on its list, Phase 3A from Sarjapura to Hebbal, and how a buyer can turn both into practical checks.

The short answer. The BMRCL website says the area 11 metres wide on both sides of the outer edge of underground metro tunnels, ramps and stations is a declared influence zone, and a BMRCL NOC is mandatory for any activity there. Its upcoming projects page lists Phase 3A, Sarjapura to Hebbal, at 36.59 km with 28 stations, and says the detailed project report is being prepared. The trade-off: a home close to a future line may be convenient one day, but a corridor still at the project report stage can shift, and a plot inside an influence zone carries an extra approval step.

What does the influence zone rule actually say?

The BMRCL influence zone page, which is in Kannada, says that keeping in mind the safety of Bengaluru Metro rail lines, the Government of Karnataka has declared the area 11 metres wide on both sides from the outer edge of Bengaluru Metro underground lines, covering tunnels, ramps and stations, as the Bengaluru Metro influence zone.

It then says that obtaining a no objection certificate from Bangalore Metro Rail Corporation Limited is mandatory to undertake any activities in this influence zone. The page links to a list of underground sections and to the gazette notification, and gives a property development email address, pd@bmrc.co.in.

The rule as described on the page is about underground structures. It does not set out a similar distance for elevated stretches, so this guide does not describe one. If your plot is near an elevated viaduct, ask BMRCL directly rather than assume either way.

Who needs to worry about the influence zone?

Three kinds of buyers. First, anyone buying a plot to build a house or a small building near an underground section, since construction is an activity, and the page says an NOC is mandatory for any activity in the zone. Second, anyone buying a flat in a new building near an underground section, since the developer should have dealt with the NOC before building. Third, anyone buying an older building near a section, where the question is whether later works or extensions needed one.

For most flat buyers, the practical step is simply to ask the developer whether the site falls in the influence zone and, if it does, to see the BMRCL NOC alongside the other approvals. For plot buyers, it is a question to settle before paying, because it affects what you can build and when.

PropNewz has covered other Bengaluru approval questions, including the BDA section 38D regularisation of houses on acquired land, which applies to a different set of properties.

What is Phase 3A and how far along is it?

The upcoming projects page on the BMRCL website lists one corridor under the heading of upcoming projects: Phase 3A, from Sarjapura to Hebbal. It gives the length as 14.45 km underground and 22.14 km elevated, a total of 36.59 km, with 11 underground and 17 elevated stations, a total of 28.

The same page says, in a note beside the heading, that the detailed project report is being prepared. That is an early stage, and alignments, station locations and timelines can change as the report and later approvals are completed. A brochure that names a future station on this corridor is describing a plan, not a fixture.

Because the corridor includes 14.45 km of underground sections, the influence zone rule above would become relevant to land near those sections once they are fixed. That is one more reason to ask questions rather than rely on proximity claims made today.

The table below sets out common claims a buyer may hear and what the BMRCL website can and cannot confirm.

Claim you may hearWhat the BMRCL website saysWhat to do
Plot is near an underground line11 m influence zone on both sides of underground structuresCheck the underground sections list
No permission needed to buildNOC from BMRCL mandatory for any activity in the zoneAsk for the NOC or apply before building
Phase 3A station coming next doorPhase 3A Sarjapura to Hebbal, DPR being preparedTreat station locations as not final
Phase 3A is a short corridor36.59 km, 14.45 km underground, 22.14 km elevatedNote which part is underground
Many stations planned28 stations, 11 underground, 17 elevatedConfirm with BMRCL before relying on one

What RERA checks still apply near a metro line?

All of them. Under section 3(1) of the Real Estate (Regulation and Development) Act, 2016, no promoter shall advertise, market, book or sell in a real estate project that needs registration without registering it. Section 11(3) requires the promoter, at the time of booking, to make available the sanctioned plans, layout plans and specifications approved by the competent authority.

Section 12 adds a safeguard on advertising: where a buyer makes an advance on the basis of information in an advertisement or prospectus and sustains loss because of an incorrect or false statement in it, the promoter shall compensate the buyer. Keep any brochure that makes metro claims, along with the date you received it.

Section 13(1) says a promoter shall not accept more than ten per cent of the cost as an advance or application fee without first entering into a written agreement for sale and registering it. PropNewz looked at another registration safeguard in its explainer on Karnataka's refusal and cancellation powers for forged documents.

What should a commuting household know from the BMRCL website?

If the point of buying near a line is a daily commute, a few practical notes on the BMRCL website are worth reading before you decide how much proximity is worth to you.

Its timetable page carries two notes: that additional trains will be run from selected intermediate stations if travel demand rises, and that train timings may change according to planned activities. Its parking section says overnight parking is not allowed, and that vehicles can be parked from 5 am and may remain until half an hour after the last train leaves the station. A household that plans to drive to a station and park every day should check whether the station it has in mind has parking at all.

Its network page describes the system as standard gauge, running on 750 volt DC third rail, with a maximum speed of 80 km per hour and an average of 34 km per hour, and six car train sets. Average speed is a useful number for rough commute planning: a 17 km ride at that average works out to about half an hour, before walking and waiting time.

What should you check before buying near a metro line?

Use this list for any Bengaluru property near an existing or planned line.

  1. Find out whether the nearest metro section is underground or elevated.
  2. If underground, check the BMRCL list of underground sections and the gazette notification linked from its influence zone page.
  3. Ask the seller or developer whether the property falls within 11 metres of an underground structure.
  4. If it does, ask to see the BMRCL NOC for the construction, or plan to apply before you build.
  5. Treat Phase 3A station names in brochures as provisional while the detailed project report is being prepared.
  6. Keep dated copies of any advertisement that makes metro claims, in case section 12 of the RERA Act applies.
  7. Confirm RERA registration and keep any advance within ten per cent until a registered agreement for sale.

If you are looking along the Sarjapura side of the city, the PropNewz page on Mayur Tranquil, Sarjapura is one listing where you can run these checks, starting with the question of how far it is from any announced alignment.

For direct questions, the BMRCL website lists a toll free helpline, 1800-425-12345, and a travel help email, travelhelp@bmrc.co.in, alongside the property development email given on the influence zone page.

Frequently asked questions

What is the Bengaluru Metro influence zone?

The BMRCL website says the Karnataka government has declared an area 11 metres wide on both sides, measured from the outer edge of Bengaluru Metro underground structures such as tunnels, ramps and stations, as the Bengaluru Metro influence zone. A no objection certificate from BMRCL is mandatory for any activity in that zone.

Do I need a BMRCL NOC to build a house near an underground metro line?

If the plot falls within the influence zone, yes. The BMRCL website says obtaining a no objection certificate from the corporation is mandatory to undertake any activities within 11 metres of the outer edge of underground tunnels, ramps or stations. The site links to the underground sections and the gazette notification.

What is the status of Namma Metro Phase 3A from Sarjapura to Hebbal?

The upcoming projects page on the BMRCL website lists Phase 3A from Sarjapura to Hebbal at 36.59 km, with 14.45 km underground and 22.14 km elevated, and 28 stations, 11 underground and 17 elevated. The page says the detailed project report is being prepared, so alignments can still change.

Should I pay more for a flat because a metro line is planned nearby?

PropNewz does not give investment advice. A planned line is not an operating one, and the BMRCL website says the Phase 3A detailed project report is still being prepared. Base your decision on the home, its approvals and your budget, and treat any future line as uncertain until it is built.

This guide summarises information on the BMRCL website and the RERA Act as checked on 22 November 2026 and is not legal advice. Confirm influence zone status with BMRCL before you buy or build.

Last updated 2026-11-22. PropNewz Team.

Contact Us

Stay updated with latest news and new projects!

Thank you! Your submission has been received, We'll get back in touch with you shortly.
Oops! Something went wrong while submitting the form.
No pressure, ever

Tell us what you want, We'll do the rest.

Share your budget and where you're looking. An advisor who has actually walked the sites will shortlist a handful of RERA-registered projects and tell you which to skip.

We only contact you about projects you ask about
No spam, no reselling your number, unsubscribe anytime
Independent advice we're paid the same whoever you pick
Thank you! Your submission has been received, We'll get back in touch with you shortly.
Oops! Something went wrong while submitting the form.