DC conversion is the order that makes Karnataka farmland buildable. Without it a Bengaluru plot gets no A Khata, building plan or loan. Here is how a buyer verifies it before paying.

Legal & Documentation
Updated on
September 9, 2026
12 min read

On the eastern edge of Bengaluru in 2026, a first time buyer signed for a tidy site near Hoskote at a price that felt like a gift. The roads were laid, boards announced a layout, and the seller was reassuring. Trouble arrived when he approached a bank. The land was still agricultural on the records, never converted, so there was no A Khata, no building plan, and no loan. His cheap site was farmland with a fence, and he could not build a thing on it.

On the outskirts of Bengaluru this is the trap that catches the most buyers. Land that looks ready for a house can still be agricultural in the eyes of the law, and the document that fixes that is the DC conversion. Here is how to check it before you pay.

The short answer. DC conversion is the Deputy Commissioner's order, under Section 95 of the Karnataka Land Revenue Act, that legally changes land from agricultural to non-agricultural use. Without it a plot cannot get an A Khata, a sanctioned building plan, a home loan or utility connections. Before you buy, pull the RTC on the Bhoomi portal, read the conversion order, check the mutation, and match the survey number to your plot. The trade off is tempting and dangerous. Unconverted agricultural land is cheaper, but building on it violates Section 95 and can invite demolition, so the discount is really a hidden risk.

What exactly is DC conversion?

It is a legal change of land use, ordered by the Deputy Commissioner under Section 95 of the Karnataka Land Revenue Act, 1964. Agricultural land in India is meant for farming, and it cannot simply be built on as homes. Conversion is the formal government order that permits that farmland to be used for a non-agricultural purpose, whether residential, commercial or industrial. Until that order exists, the land remains agricultural no matter how many layout boards are planted on it.

The order matters because so much else hangs off it. Converted land can get an A Khata, a sanctioned building plan, bank financing, and water and electricity connections. Unconverted land gets none of these, and constructing on it violates Section 95 and risks a demolition order. So conversion is not a nicety, it is the gate that separates a buildable, financeable site from farmland you cannot legally develop.

Why does an unconverted plot leave you stuck?

Because every practical step of owning a home depends on the land being non-agricultural. A bank will not lend on agricultural land held for a house, the local body will not sanction a building plan on it, and the khata that comes with it, if any, is the lesser B Khata rather than a clean A Khata. Utility boards hesitate too, so even water and power become a struggle.

This is why the Hoskote buyer was stranded. His money was real, the roads were real, but the legal status of the land was agricultural, so the whole machinery of building and financing was closed to him. An unconverted plot can sit unusable for years, and reselling it is hard because the next buyer faces the same wall. Our guide to A Khata, B Khata and e-Khata explains why the khata that follows conversion matters so much.

How do you verify a DC conversion before buying?

You confirm it through four checks read together, never a single glance at a photocopy. First, pull the current RTC, the Record of Rights, Tenancy and Crops, on the Bhoomi portal for the survey number, and read the land use column, which on converted land shows non-agricultural rather than agricultural. Second, get the DC conversion order copy itself and read the survey number, the extent, the permitted purpose, the date and every condition. Third, confirm the mutation entry recording the conversion in the village accountant's register. Fourth, cross check the survey number and pull a fresh encumbrance certificate from Kaveri.

Each check guards against a different trick. An order can exist on paper while the RTC still reads agricultural, or a genuine order can belong to a neighbouring survey number, not your plot. Reading all four together, and matching the survey number every time, is what turns a hopeful assumption into a verified fact. Pair this with a full title check, which our guide to the encumbrance certificate and title search in Bengaluru sets out.

Is DC conversion the same as layout approval?

No, and confusing the two is a costly mistake. DC conversion changes the land use to non-agricultural, but it does not by itself carve the land into a legally formed layout of sites. That second job belongs to a layout approval from the planning authority, such as the BDA, the BMRDA or the local body. Converted land without layout approval is legally non-agricultural, yet it is not a properly formed site you can safely buy as a plot.

So you ask for both documents, the conversion order and the sanctioned layout plan, and you match the survey number on each to the plot in front of you. A seller who shows one and waves away the other is only half done. The table below sets out how the two sanctions differ, so you know exactly what each one gives you.

SanctionDC conversion orderLayout approval
What it doesChanges land use to non-agriculturalLegally forms the land into plots
Issued byThe Deputy CommissionerThe planning authority
What it enablesA Khata, plan, loan and utilitiesA legally formed, sellable site
If it is missingLand stays agricultural, no buildingNon-agricultural, but not a proper site

Which land simply cannot be converted?

Some land can never be converted, whatever an application claims, so this is the first thing to rule out. Land that sits in a green belt, a forest, a water body buffer, or an area reserved in the master plan for a road, a park or a public purpose cannot be converted, and an acquisition notification blocks it too. No conversion order can override a reservation meant to protect these uses, so a seller promising conversion on such land is promising something the law will not allow.

The safeguard is to check the master plan zoning before you fall for the plot. Confirm from the RTC and the master plan that the parcel is convertible in the first place, because a fat file of documents on green belt land is worthless. The application process itself runs online through the state land conversion portal, with fees commonly quoted at around one to two percent of the guidance value in master plan and BBMP areas, though the exact figure varies with location and use.

If the land is convertible, the owner applies to the Deputy Commissioner, today largely online, submitting the RTC, a survey sketch, the encumbrance certificate, the registered sale deed, the mutation record and no objection certificates from departments such as agriculture, forest and highways. A straightforward application is meant to be decided within a couple of months. As a buyer you do not run this process, but knowing what it involves helps you tell a genuine, completed conversion from a promise the seller has barely begun. A conversion that is still pending is not a conversion at all, so treat an in process claim exactly as you would an in process layout approval.

What should you check before paying for a plot?

Verify the land status before the price, because a cheap site on agricultural land is not a bargain, it is a liability. Run this checklist before any advance.

  1. Pull the current RTC, or Pahani, on the Bhoomi portal and read the land use column.
  2. Get the DC conversion order copy and check the survey number, extent, purpose and date.
  3. Confirm the mutation record shows the conversion in the village accountant's register.
  4. Match the survey number on the order to the exact plot you are buying.
  5. Ask for the sanctioned layout approval too, since conversion alone does not form a site.
  6. Check the master plan zoning is not green belt, forest or a reserved public purpose.
  7. Pull a fresh encumbrance certificate to confirm no dispute or acquisition on the land.

A verified conversion, matched to your survey number and backed by a layout approval, is what turns a patch of the outskirts into a home you can actually build. A well formed plotted project such as Abhee Hoskote plots is the kind of address where asking for the conversion order and the layout plan together is a routine, reasonable request.

Frequently asked questions

What is DC conversion in Karnataka?

It is the Deputy Commissioner's order, under Section 95 of the Karnataka Land Revenue Act, that changes a piece of land from agricultural to non-agricultural use. Without it, farmland cannot legally become a home site, and it cannot get an A Khata, a building plan, a bank loan or proper utility connections.

How do I check if land is DC converted?

Never trust a photocopy on its own. Pull the current RTC on the Bhoomi portal and read the land use column, get the conversion order copy, confirm the mutation entry in the village records, and match the survey number to your plot. These four checks read together are what tell you the conversion is genuine.

Is DC conversion the same as layout approval?

No, they are two separate sanctions. DC conversion makes the land non-agricultural, but it does not turn that land into a legally formed site. For that you also need a sanctioned layout approval from the planning authority, so ask for both documents and match the survey number printed on each of them.

Can any agricultural land be converted?

No. Land marked as green belt, forest, a water body buffer, or reserved in the master plan for a road, a park or a public purpose cannot be converted, whatever a seller promises. Check the master plan zoning first, because a conversion application on protected land will simply fail however complete it looks.

Sources opened for this article include PKP Advocates on checking DC converted land and Homesok on DC conversion in Bangalore. Rules and fees change, so verify the current position on the official Bhoomi and land conversion portals and with a property lawyer before you buy.

Last updated 2026-09-09. PropNewz Team.

Contact Us

Stay updated with latest news and new projects!

Thank you! Your submission has been received, We'll get back in touch with you shortly.
Oops! Something went wrong while submitting the form.
No pressure, ever

Tell us what you want, We'll do the rest.

Share your budget and where you're looking. An advisor who has actually walked the sites will shortlist a handful of RERA-registered projects and tell you which to skip.

We only contact you about projects you ask about
No spam, no reselling your number, unsubscribe anytime
Independent advice we're paid the same whoever you pick
Thank you! Your submission has been received, We'll get back in touch with you shortly.
Oops! Something went wrong while submitting the form.