BESCOM Name Transfer: How a New Bengaluru Flat Owner Moves the Connection

After you buy in Bengaluru, the electricity connection should be in your name. Here is what BESCOM needs, what it costs, and the faster online route once your e-Khata mutation is complete.

Legal & Documentation
Updated on
September 15, 2026
12 min read

A family that moved into a resale flat in Whitefield in the middle of 2026 kept paying the electricity bill without a second thought, until a billing dispute arrived addressed to a person they had never met, the owner from two sales ago. The connection had never been transferred. Sorting it out meant chasing a stranger for a no objection and standing in a queue they could have avoided, all because a routine step had been skipped at handover. The connection was working. The paperwork behind it was not.

The short answer. After you buy a flat or house in Bengaluru you should transfer the BESCOM electricity connection into your name, so the bills, the security deposit and the consumer record all belong to you. The transfer needs your sale deed, the latest paid bill, your khata or e-Khata, the tax receipt and a couple of undertakings on stamp paper, with a modest transfer fee. You can apply through the sub division office or, once your e-Khata mutation is done, through the faster online route on the official portal at bescom.karnataka.gov.in. The trade off is a short errand now against billing and deposit headaches later.

Why does the connection need to be in my name?

Because the electricity connection is a consumer account, and until it is transferred that account still belongs to whoever held it before you. That means the bills, the security deposit lodged with BESCOM and any correspondence continue to sit against the old name. You may be paying the bill, but you are not the recognised consumer, which can matter the day a meter needs replacing, a load has to be changed, or a dispute lands on the account. Getting the connection into your name closes that gap and puts the deposit and the record where they belong.

There is a quieter benefit too. A connection cleanly held in your name, matched to your khata and your sale deed, is one more record that lines up with your ownership. When you eventually sell, a buyer doing careful due diligence will find a consistent trail rather than a connection still in a stranger name, which makes your own sale smoother.

Skipping the transfer also carries a small but real risk that most buyers never think about. If the previous holder had an unpaid dues history on that connection, or if the deposit records are muddled, those problems stay attached to the account you are quietly paying against. Bringing the connection into your name is the moment to confirm there are no arrears riding on it, so you start your ownership with a clean consumer account rather than inheriting a tangle you did not create.

What documents do I need?

You need proof of ownership, proof of the connection, and a couple of standard undertakings. The registered sale deed establishes that you own the property, the latest paid bill identifies the exact connection through its account or RR number, and your khata or e-Khata ties the property to you on the municipal record. The table below sets out the core set so you can assemble it in one go.

DocumentWhy it is neededNote for buyers
Registered sale deedProves you own the propertyUsually a notarised copy of all pages
Latest paid electricity billIdentifies the exact connectionCarries the account or RR number
Khata or e-Khata in your nameConfirms the municipal ownership recordPrerequisite for the faster online route
Agreement and indemnity bondStandard consumer undertakingsOn stamp paper as prescribed

Alongside these, keep the last property tax paid receipt, your identity proof and a clear photograph of the meter showing the serial number and current reading, since these are commonly requested when the application is verified. If any of your ownership documents are in a language the office does not process directly, ask in advance whether a translation or an extra attestation is needed, because a small gap of this kind is the usual reason a file is sent back.

How do I actually apply?

You apply either the traditional way or through the newer online route. On the traditional path you submit the prescribed application, often referred to as Form 13, at the sub division or operations and maintenance office that serves your area, which you can identify from the code printed on the bill. A junior engineer verifies the details, you pay a small transfer fee, and the change reflects on the bill in the weeks that follow. It is a well worn process, and it works, though it can involve a visit or two.

The 2026 online route is designed to be faster. Once your e-Khata mutation is complete under the Greater Bengaluru Authority, the BESCOM system can read verified ownership straight from that municipal record, which allows a name transfer through the portal using Aadhaar based verification, in some cases without a separate builder no objection. The prerequisite is the completed e-Khata mutation, so getting your khata in order first is what unlocks the quicker path.

Whichever route you use, apply for the connection that matches how you will actually use the property. A home connection and a commercial connection are billed on different tariffs, so if you are buying a flat to live in, make sure the connection is classified as domestic. If a previous holder had it under a different category, the transfer is the natural moment to correct that, rather than discovering a mismatch months later when the tariff on your bill looks higher than your neighbours pay.

What does it cost and how long does it take?

The direct cost is small, but the timeline depends on the route. The transfer fee itself is modest, of the order of a few hundred rupees for an ordinary home connection, plus the cost of the stamp paper for the undertakings. On the traditional route, after the junior engineer verification, the name change commonly appears on the bill within about fifteen to thirty days. On the online route, where your e-Khata is already mutated, the change can be far quicker, sometimes within minutes. The security deposit already lodged against the connection generally carries over, so you are transferring an existing account rather than paying for a brand new one, which is another reason to transfer rather than to quietly keep paying under the old name.

It is worth budgeting a little patience rather than a lot of money. The fees here are trivial against the price of the property, so the real cost is the small effort of assembling the file correctly the first time. Applications tend to stall not because of money but because a document is missing, a copy is not notarised where required, or the meter photograph is unclear. Getting the paperwork right in one pass is the difference between a transfer that goes through quietly and one that bounces back for a second visit.

What order should I do things in?

Sequence matters, because the utility transfer sits downstream of your ownership records. Get your ownership and municipal records in place first, then the connection follows smoothly. Use this checklist.

  1. Complete your sale registration so the sale deed is in your name.
  2. Apply for and complete the khata or e-Khata mutation into your name.
  3. Collect the latest paid electricity bill and note the account or RR number.
  4. Photograph the meter clearly, showing the serial number and current reading.
  5. Prepare the agreement and indemnity bond on the prescribed stamp paper.
  6. Submit the transfer application online or at your sub division office with the fee.
  7. Follow up until the next bill arrives in your name and keep a copy for your records.

How does this fit my wider handover checklist?

The electricity transfer is one of several handover steps, and it works best when the ones before it are done. Because the fast online route depends on your e-Khata, it helps to read our guide to A khata, B khata and the e-Khata mandate and to sort that record early. It also pays to confirm the building itself is cleared for occupation, which is why our explainer on the occupancy certificate and completion certificate is worth reading before you take possession. Utilities, khata and occupancy together turn a set of keys into a home that is fully yours on every record. Treat the connection transfer not as an optional chore but as the last link in a chain that starts with your sale deed and ends with every service account carrying your name, so that nothing about the property still quietly belongs, on paper, to the person who sold it to you.

Why should a new flat owner transfer the BESCOM connection?

Because until the connection is in your name, the bills, the security deposit and the official record still point to the previous owner or builder. Transferring it makes you the recognised consumer, so you receive the bills, you hold the deposit, and any future connection issue is handled in your name rather than a stranger you may never reach.

What documents are needed for a BESCOM name transfer?

You typically need the registered sale deed, the latest paid electricity bill, the khata or e-Khata in your name, the last property tax paid receipt, and identity proof, along with a power supply agreement and an indemnity bond on stamp paper. A meter photograph showing the serial number and current reading is usually asked for as well.

How long does a BESCOM name transfer take?

It varies with the route. The traditional application through the sub division office, with a junior engineer verification, commonly reflects on the bill within about fifteen to thirty days. Where your e-Khata mutation is complete, the 2026 online route that pulls ownership from the municipal record can be far quicker, sometimes within minutes using Aadhaar based verification.

Do I need the builder or seller NOC to transfer the connection?

Often yes on the traditional route, where a no objection from the previous holder is part of the file. However, the newer online process that reads verified ownership from your completed e-Khata mutation is designed to work without a builder NOC. Confirm the current requirement on the official BESCOM portal before you assemble the file.

Last updated 2026-09-15. PropNewz Team.

Contact Us

Stay updated with latest news and new projects!

Thank you! Your submission has been received, We'll get back in touch with you shortly.
Oops! Something went wrong while submitting the form.
No pressure, ever

Tell us what you want, We'll do the rest.

Share your budget and where you're looking. An advisor who has actually walked the sites will shortlist a handful of RERA-registered projects and tell you which to skip.

We only contact you about projects you ask about
No spam, no reselling your number, unsubscribe anytime
Independent advice we're paid the same whoever you pick
Thank you! Your submission has been received, We'll get back in touch with you shortly.
Oops! Something went wrong while submitting the form.