Anuraag Adeep Review: Ajjagondahalli, Hoskote Apartments Due March 2029
Registered 76 home Hoskote project due 2029 from a builder with delivered Varthur buildings. Sold as Varthur, priced on request.
On 29 October 2026, Anuraag Constructions registered a 76 apartment building with Karnataka RERA. The number is familiar: the same builder's Anuraag Abode on Balagere Road in Varthur was also a 76 unit project, approved in December 2017 and shown as completed against a June 2019 target on a RERA data mirror. The new one, Anuraag Adeep, sits a few kilometres further out, at Ajjagondahalli Village in Hosakote taluk, although portals sell it as Varthur. That difference in label, and what it means for civic services, prices and resale, is the first thing a buyer needs to understand.
The short answer: Anuraag Adeep is a RERA registered (PRM/KA/RERA/1250/304/PR/291026/009052) apartment project of 76 homes on 1.16 acres at Ajjagondahalli, Anugondanahalli Hobli, Hosakote, approved by the Hoskote Planning Authority, with a declared completion date of 31 March 2029. Price is on request. An aggregator lists 2 and 3 BHK homes of about 1,105 to 1,460 sq ft, not yet verified. It suits Whitefield and Varthur side end users who want a smaller building from a builder with delivered projects nearby. The biggest trade-off: a Hoskote taluk address marketed at Varthur expectations.
What is Anuraag Adeep and who should consider it?
Anuraag Adeep is a single compact apartment project of 76 homes on 1.16 acres, about 66 homes per acre by PropNewz arithmetic, spread over nine survey numbers in survey 39 at Ajjagondahalli Village (PIN 560087). The Anuraag Adeep project page lists it under Hoskote, which is where the RERA record places it: Anugondanahalli Hobli, Hosakote taluk, Bengaluru Rural district.
It suits a family working in Whitefield, Varthur or the ITPL and EPIP belt that wants a 2 or 3 BHK in a small community and can wait until early 2029. Its completion date is the earliest among the Hoskote apartment launches PropNewz tracks with a declared date. It is a weaker fit for buyers who expect the civic services and resale depth of a core Whitefield or Varthur address, and for investors who need quick liquidity in a 76 unit building.
Who is Anuraag Constructions and what have they delivered?
Anuraag Constructions is a Varthur based builder of mid segment 2 and 3 BHK apartments, with projects listed by portals at Varthur and Panathur, including Anuraag Abode, Anuraag Amogh and Anuraag Anmol. The most useful verified marker is Anuraag Abode: the RERA data mirror records 76 apartments on Balagere Road, approval on 22 December 2017, a proposed completion of 30 June 2019 and a completed status. The same mirror shows a partnership promoter name and some odd fields, so confirm the record on rera.karnataka.gov.in.
Portals differ on how many projects the firm has delivered, giving figures between two and seven. Rather than rely on a count, visit Anuraag Abode and Anuraag Amogh, ask residents about construction quality, water supply, handover delays and how the builder handled snag lists, and check RERA for any complaints. A builder that has finished buildings of the same size a short drive away gives you something concrete to judge.
Where exactly is it, and how good is the connectivity?
The project is at Ajjagondahalli in Anugondanahalli Hobli, a village in Hosakote taluk beyond the Varthur and Whitefield edge. The Square Yards listing markets it as Varthur and says Whitefield Main Road and the HAL Airport Road corridor are about 3 km away, with Kadugodi and Pattandur Agrahara as the Purple Line metro stations it names. PropNewz has not measured these distances. The PIN, 560087, is shared with Varthur, which partly explains the label.
The label matters because a Bengaluru Rural village under the Hoskote Planning Authority is not served by the Greater Bengaluru civic bodies that run Varthur. Water is the clearest example. Hoskote MLA Sharath Bachegowda told Siasat in October 2026 that a Rs 2,500 crore Asian Development Bank backed Cauvery water project for Hoskote is at the project report and tender stage, and that the KR Puram to Hoskote metro's project report has begun. Both are plans; ask the builder how the building will be supplied with water from 2029, and what the borewell, tanker and sewage treatment arrangements will be.
What homes are planned and what will daily life be like?
The RERA list confirms 76 apartments but not the BHK mix, carpet areas or floors. The aggregator shows one tower with 2 BHK homes of about 1,105 and 1,280 sq ft and 3 BHK homes of about 1,325 and 1,460 sq ft, plus RCC frame construction and vitrified tile floors. Those sizes are compact for 3 BHK homes, so check carpet area and room dimensions rather than only the saleable figure.
Amenities listed by the aggregator are modest: a play area, a jogging track, yoga space, indoor games, power backup and security. That fits a 1.16 acre site. A smaller amenity set usually means lower maintenance, but 76 households still share the full cost of lifts, generator, sewage treatment and security, so ask for a projected monthly maintenance figure.
What will it cost once taxes and charges are added?
No price is published: the PropNewz page shows price on request. The aggregator gives only a Varthur locality average, which is not a project price and may overstate what a Hosakote taluk address should command. Use the cost sheet, not the locality average, as your reference.
The fact sheet asks for a cost sheet that separates the basic rate, car parking, GST, utility deposits, clubhouse charges, the corpus fund and maintenance advance, with stamp duty and registration shown apart. GST is 5 percent on an under construction, non affordable apartment, without input tax credit. Stamp duty in Karnataka is about 5.6 percent including cess and surcharge for homes above Rs 45 lakh, plus a registration fee of 2 percent (doubled from 1 percent in August 2025), about 7.6 percent in all; confirm current rates on the Kaveri portal. Together with GST, that is over 12 percent on top of the agreement value before parking and deposits, so compare all inclusive prices per sq ft of carpet area.
What is the RERA, approval and possession position?
Anuraag Adeep is registered with Karnataka RERA under PRM/KA/RERA/1250/304/PR/291026/009052, registered on 29 October 2026, listed as a new project launch and carried by PropNewz as Upcoming, with a declared completion date of 31 March 2029. The plan was approved by the Hoskote Planning Authority under Plan No. HPA/CC/557/2025-26 on 27 March 2026.
The RERA ID comes from the PropNewz project page. Verify it on rera.karnataka.gov.in and match the promoter, all nine survey numbers, PID 150300402000720277, the 76 unit count and the completion date with your agreement. Ask when the occupancy certificate is expected, since registration of your sale deed and loan disbursement depend on it.
How does Anuraag Adeep compare with other Hoskote options?
Two Hoskote apartment launches on PropNewz frame the choice. Whitestone Twinkles is a similar sized building at Huskur, and Assetz Naru and Nami is a large branded project with a much later date.
| Dimension | Anuraag Adeep | Whitestone Twinkles | Assetz Naru and Nami |
|---|---|---|---|
| Price band | Price on request | Price on request | Price on request |
| Configurations | 76 apartments (mix to be confirmed) | 74 apartments (mix to be confirmed) | Apartments (to be confirmed) |
| Possession | March 2029 (RERA) | December 2029 (RERA) | January 2032 (Phase 1, RERA) |
| RERA status | PRM/KA/RERA/1250/304/PR/291026/009052 | PRM/KA/RERA/1250/304/PR/020926/008901 | PRM/KA/RERA/1250/304/PR/081026/009004 (Phase 1) |
| Locality | Ajjagondahalli, Hoskote | Huskur, Hoskote | Hoskote |
Anuraag Adeep has the earliest completion date of the three and a builder with a verifiable finished project of the same size. The branded alternative offers scale and amenities but asks you to wait into 2032.
What are the risks and what should you check before booking?
The main risks are labelling, information and infrastructure. The project is sold as Varthur but sits in Hosakote taluk, so check that the price reflects that. There is no published price or RERA listed unit mix. Piped water and metro are still plans. And a 76 home building will have a thin resale market.
| # | Check before booking |
|---|---|
| 1 | Verify PRM/KA/RERA/1250/304/PR/291026/009052 on rera.karnataka.gov.in and match promoter, survey numbers and completion date. |
| 2 | Get a written cost sheet separating base rate, parking, GST, deposits, club charges, corpus and maintenance, with stamp duty and registration listed apart. |
| 3 | Ask for the RERA filed carpet area and room dimensions of your exact unit. |
| 4 | Have a lawyer check title for all nine survey numbers and the land conversion order. |
| 5 | Get the water supply, sewage treatment and power backup plan in writing. |
| 6 | Visit Anuraag Abode or Anuraag Amogh and talk to residents about quality and handover. |
| 7 | Drive from the site to Whitefield and Varthur at peak hour and note the real travel time. |
What do buyers ask most about Anuraag Adeep?
What is the price of Anuraag Adeep?
Pricing is on request and no price list has been published as of November 2026. Ask for an all inclusive written cost sheet for your exact unit.
Is Anuraag Adeep in Varthur or Hoskote?
The RERA record places it at Ajjagondahalli Village, Anugondanahalli Hobli, Hosakote taluk. Portals market it as Varthur because it shares PIN 560087.
Is Anuraag Adeep RERA registered?
Yes, under PRM/KA/RERA/1250/304/PR/291026/009052 since 29 October 2026, with a Hoskote Planning Authority approved plan. Verify it on rera.karnataka.gov.in.
When will Anuraag Adeep be ready?
The declared RERA completion date is 31 March 2029. Ask when the occupancy certificate is expected.
What is the PropNewz verdict on Anuraag Adeep?
Anuraag Adeep is a sensible shortlist candidate for a Whitefield side end user: registered, plan approved, the earliest completion date among comparable Hoskote launches, and from a builder with a same size project you can inspect. The caution is about expectations. This is a Hosakote taluk address with Hoskote level civic services today, and its price should reflect that rather than a Varthur average. Get the cost sheet, the carpet areas and the water plan before you book.
This review reflects information available as of November 19, 2026.
Talk to PropNewz to evaluate this project. Let's chat.
By PropNewz Team
Contact Us
Stay updated with latest news and new projects!
Tell us what you want, We'll do the rest.
Share your budget and where you're looking. An advisor who has actually walked the sites will shortlist a handful of RERA-registered projects and tell you which to skip.