Adarsh Lake Reserva Review: JP Nagar 7th Phase 2 and 3 BHK Homes Near Puttenahalli Lake
A credible JP Nagar 2 and 3 BHK near the new Pink Line, due Dec 2027, but verify today's price and construction stage first.
On November 14, 2026, the first Pink Line trains rolled along Bannerghatta Road at 6 am, and two of the six new elevated stations, Hulimavu and IIMB, sit a short ride east of Puttenahalli Lake. That is the corner of JP Nagar 7th Phase where Adarsh Developers is building Adarsh Lake Reserva, a two-tower, 162-home project registered with Karnataka RERA in January 2023 and due for completion on 31 December 2027.
The timing makes this a good moment to look hard at it. The metro has moved from promise to timetable, the RERA completion date is about 13 months out, and the only public price list is nearly four years old. Here is what a buyer can rely on, what is indicative, and what still needs checking.
The short answer: A credible, end-user-friendly 2 and 3 BHK option inside established JP Nagar 7th Phase, from Rs 1.06 Cr (indicative, January 2023 portal listing) for 880 to 1,339 sq ft of carpet area, RERA registered under PRM/KA/RERA/1251/310/PR/200123/005639 with completion declared for December 2027. The single biggest trade-off is uncertainty: today's price and the actual construction stage are both unconfirmed, so verify both before you book.
What is Adarsh Lake Reserva, and who is it for?
Adarsh Lake Reserva is a compact high-rise of two towers, each ground plus 26 floors, holding 162 apartments, of which 81 are 3 BHK and the rest 2 BHK. It is registered as Adarsh Lake Reserva Phase 1, which hints at room for a later phase, though none appears on the RERA portal. Full listing details sit on the Adarsh Lake Reserva project page.
It suits salaried families and upgraders who want to stay inside south Bengaluru rather than move out to Kanakapura Road or the far end of Bannerghatta Road, and who value a small community near a restored lake.
Who is the builder, and what is the track record?
Adarsh Developers, part of the Adarsh Group, was founded in Bengaluru in 1988 and is led by chairman and managing director B M Jayeshankar. The promoter on the RERA record is M/s Adarsh Developers, a partnership firm registered at Richmond Town. The group has a long local history here, having delivered Adarsh Citrine on Silver Oak Street in JP Nagar 7th Phase and Adarsh Nivas at Jaraganahalli.
That neighbourhood record is the strongest argument for the project, because you can walk around older Adarsh buildings nearby and judge how they have aged. Its parallel launch, Adarsh Rosewood in Bellandur, shares the same December 2027 completion date, which gives a useful second reference point for the developer's delivery pace over the next year.
How good is the location and connectivity?
The location is the project's clearest strength. The listed address is Brahmananda Farm, Silver Oak Layout, Puttenahalli, JP Nagar 7th Phase, Bengaluru 560078, and the portal map pin sits roughly 240 m from the centre of Puttenahalli Lake. Bannerghatta Road is roughly 1 km east in a straight line, with Apollo Hospitals and Fortis Hospital about 2 km away by portal-listed road distance, and Royal Meenakshi Mall about 3.3 km.
Metro access changed this month. The 7.5 km elevated Pink Line stretch from Kalena Agrahara to SG Palya opened to commuters on November 14, with trains roughly every eight minutes and fares from Rs 10 to Rs 30, according to Siasat. A day-one ground report in The Federal notes commuters already want shorter intervals, and the underground section is expected between March and May 2027. The Hulimavu and IIMB stations are roughly 1.5 to 2.5 km east of the site, and the Green Line's Yelachenahalli station is roughly 2 km west. Neither is walkable from the gate, and the inner roads around Puttenahalli and Arekere are narrow and slow at school and office hours.
One practical warning: some portals label this project Bangalore North because they confuse it with the Puttenahalli near Yelahanka. The RERA record places it in Bengaluru South taluk.
What are the homes like, and what lifestyle can you expect?
The homes are efficient rather than generous. Portals list 2 BHK units of about 880 and 901 sq ft and 3 BHK units of about 1,230 and 1,339 sq ft, all on carpet area. The RERA record declares the 3 BHK type at 120 sq m (about 1,292 sq ft) with a 9 sq m balcony, so ask which figure applies to your unit.
Portal specification sheets mention engineered wood flooring in the master bedroom, vitrified tiles elsewhere, UPVC windows, dual plumbing with recycled water for flushing, individual water meters, and full DG backup for the allocated load. Portals also list a long amenity set, including a clubhouse, pool, gym and several sports courts. No official amenity brochure has been published, and a two-tower site may not hold every item, so check each against the approved plan.
What does Adarsh Lake Reserva really cost?
The indicative starting point is Rs 1.06 Cr to Rs 1.08 Cr for the 2 BHK and Rs 1.48 Cr to Rs 1.61 Cr for the 3 BHK, which works out to roughly Rs 12,000 per sq ft of carpet area. These are portal-listed builder prices from the January 2023 launch listing, and no newer price list has been published, so expect today's quote to differ.
The full cost stack is larger. Typical additions, not yet confirmed for this project, include GST at 5 percent on an under-construction home, Karnataka stamp duty and registration of roughly 6.6 to 7.6 percent combined depending on value, plus floor rise, car parking if charged separately, clubhouse membership, corpus fund, advance maintenance and BESCOM and BWSSB connection deposits. On a Rs 1.48 Cr 3 BHK, GST and registration alone could add around Rs 17 lakh to Rs 19 lakh. Also confirm whether any quote is on carpet or super built-up area, because JP Nagar portal averages are usually quoted on super built-up.
Is the RERA registration in order, and when is possession?
Yes, the project is registered with Karnataka RERA as Adarsh Lake Reserva Phase 1 under PRM/KA/RERA/1251/310/PR/200123/005639, approved on 20 January 2023, with a declared completion date of 31 December 2027, as a RERA aggregator copy also shows. One portal, Housing.com, prints a different number ending 005637. That number does not match the K-RERA record, so rely on the number ending 005639.
The land extent is the open question. Portals say 5.3 acres, but the 162 homes and the sanctioned FAR of 2.2458 point to roughly 2.2 to 2.5 acres for this phase on PropNewz arithmetic. PropNewz has not seen a recent construction update, so the floor level reached in each tower is not confirmed here.
How does it compare with nearby options?
New south Bengaluru supply is arriving further out and later. Two projects registered with RERA in the last fortnight, 42 Estates In The Wake of Light in JP Nagar 9th Phase and Aryan Alturra in Raghavanapalya, both carry completion dates years after Adarsh Lake Reserva.
| Dimension | Adarsh Lake Reserva | 42 Estates In The Wake of Light | Aryan Alturra |
|---|---|---|---|
| Price band | Rs 1.06 Cr to Rs 1.61 Cr (indicative, January 2023 portal listing) | 3 BHK Rs 2.02 Cr to Rs 2.21 Cr (indicative); penthouse on request | Not published, to be confirmed |
| Configurations | 2 and 3 BHK, about 880 to 1,339 sq ft carpet | 3 BHK about 1,778 to 1,915 sq ft; 4 BHK penthouses | To be confirmed |
| Possession | 31 December 2027 (RERA declared) | September 2031 (RERA completion) | 31 July 2030 (RERA completion) |
| RERA status | Registered, January 2023 | Registered, November 2026 | Registered, November 2026 |
| Distance or access to a key hub | Roughly 1.5 to 2.5 km to Pink Line Hulimavu and IIMB stations | Doddakallasandra Green Line station within roughly five minutes, per listings | Off Bannerghatta Road per listing; site access to be confirmed |
Adarsh Lake Reserva wins on timing and entry price, though its price is the oldest figure here.
What should you check before booking Adarsh Lake Reserva?
| # | Check before booking |
|---|---|
| 1 | Confirm registration PRM/KA/RERA/1251/310/PR/200123/005639 on rera.karnataka.gov.in and that it covers your tower and flat. |
| 2 | Read the latest quarterly progress report and see the structure on site. |
| 3 | Check the declared land extent and ask whether a later phase will share amenities or the approach road. |
| 4 | Get a dated, itemised cost sheet stating carpet and super built-up areas, rate, floor rise, parking, corpus and GST. |
| 5 | Ask for the BBMP sanctioned plan, survey numbers and title documents for the Brahmananda Farm land. |
| 6 | Verify tower orientation and floor plans before paying for any lake view. |
| 7 | Obtain the specification annexure to the agreement for sale and compare it with portal claims. |
What are buyers asking about Adarsh Lake Reserva?
What is the price of Adarsh Lake Reserva?
Adarsh Lake Reserva is listed from Rs 1.06 crore for a 2 BHK to Rs 1.61 crore for the largest 3 BHK. These are portal-listed builder prices carried since the January 2023 launch listing, so treat them as indicative. GST, stamp duty, registration and other charges are extra, and a dated cost sheet from the developer is essential.
Is Adarsh Lake Reserva RERA registered?
Yes. Adarsh Lake Reserva is registered with Karnataka RERA as Adarsh Lake Reserva Phase 1 under PRM/KA/RERA/1251/310/PR/200123/005639, approved on 20 January 2023. One portal prints a different number, so rely on the K-RERA record and verify it yourself on rera.karnataka.gov.in before paying any booking amount.
When is possession at Adarsh Lake Reserva?
The declared completion date on Karnataka RERA is 31 December 2027, roughly 13 months away. PropNewz has not seen a recent construction update, so read the latest quarterly progress report on the RERA portal, visit the site to judge how far each tower has risen, and ask whether an extension is expected.
Who is Adarsh Lake Reserva best suited for?
Adarsh Lake Reserva suits end users who want a compact 2 or 3 BHK in established JP Nagar, near Puttenahalli Lake, the Bannerghatta Road hospitals and the new Pink Line. It suits buyers comfortable with a small two-tower community and a late 2027 handover. Buyers chasing large homes or certain lake views should look carefully first.
What are the risks, and should you buy Adarsh Lake Reserva?
Four risks stand out. The published price dates from January 2023, so the real quote could be meaningfully higher. Construction progress is unverified for a ground plus 26 tower due in about 13 months, so a delay or RERA extension is possible. The land figures do not reconcile, which matters for open space and any future phase sharing amenities. And the lake name sells a view no plan confirms, since no tower orientation has been published.
For an end user who wants to live in JP Nagar, it deserves a place on the shortlist: an established address, a new metro line nearby, a developer with local history and an earlier handover than competing launches. The case rests on two things you must confirm in writing: a current dated price that still lands near the old Rs 12,000 per sq ft of carpet area, and visible construction progress that makes December 2027 believable. If either fails, wait for the next RERA progress report before committing.
This review reflects information available as of November 24, 2026.
Talk to PropNewz to evaluate this project. Let's chat.
By PropNewz Team