Sidvin Serenity 2 Review: A Buyer's Look at the M Hosahalli Plots, Hoskote
A freshly registered Hoskote plotted layout for patient buyers; only 10 per cent built and price unpublished, so verify before any EOI.
On 6 November 2026, five days before this review, Karnataka RERA issued registration number PRM/KA/RERA/1250/304/PR/061126/009086 to a 5.5 acre field at M Hosahalli village, north east of Hoskote town. The filing describes 100 plots, about 10 per cent of the development work done, and a completion date of 5 December 2029. Listings say an expression of interest with early-bird pricing is already open. A fresh registration, no published price and three years of work ahead call for care.
This review of Sidvin Serenity 2 reads the RERA record first and the marketing second.
Short answer: Sidvin Serenity 2 is a 100 plot layout on 5.5 acres at M Hosahalli, Hoskote, by Sidvin Urban Developers, RERA registered on 6 November 2026 with completion due by 5 December 2029. Most plots are 30 x 40 ft (about 1,200 sq ft), with some 30 x 60 ft plots and odd sites. The price is on request. It is a reasonable entry plot for a patient buyer; the biggest trade-off is that only about 10 per cent of the works were done at registration, so you are buying a plan, not a finished layout.
What is Sidvin Serenity 2 and who is it for?
It is a plotted layout approved by the Hoskote Planning Authority, the second under the Serenity name from the same promoter, and it suits buyers who want an entry-size plot near Hoskote and can wait to build. The site at survey numbers 62/1, 76/1 and 76/2 falls in Jadigenahalli Hobli, with water listed on RERA as borewell supply plus the Mugabala Grama Panchayath.
The natural buyer is someone holding land for a future home, perhaps an end user planning to build in the early 2030s. It is not for anyone who wants to start construction next year, or who expects clubhouse-style amenities. This is a plain plotted layout of roads, drains, power and two parks.
Who is Sidvin Urban Developers and what has it delivered?
Sidvin Urban Developers is a Hoskote-based promoter with a short, still unfinished public record in plotted layouts. Aurum PropTech's summary of RERA data for the first Sidvin Serenity lists the promoter as a partnership firm with nine partners and an office in Hoskote, with 165 plots, RERA approval in November 2025 and a completion date of 31 December 2027. Listings also show other Sidvin-branded layouts around Doddaballapura and Hoskote.
The first Serenity is not yet past its own completion date, so there is no finished Serenity layout to inspect. Visit Phase 1, look at road quality, drains, plot stones and electrical work, and ask Phase 1 buyers whether khata transfers and registrations have gone smoothly. The promoter website field on the Serenity 2 RERA record is blank; the brand trades as Sidvin Developers.
How well connected is M Hosahalli?
It is a car-dependent location on the outer side of Hoskote, and PropNewz has not measured drive times from the RERA pin at 13.103919 N, 77.885926 E. Listings for the first Serenity layout describe Old Madras Road (NH 75) as about 1 km away, but that is the earlier phase, and Serenity 2 has its own coordinates. Drive the route to Hoskote town, Old Madras Road and Whitefield yourself at peak hour.
Regional roads are the main argument for this belt. A Swarajya report from 6 August 2026 said the 80 km Dobaspet to Hoskote stretch of the Satellite Town Ring Road has been running for over two years, with the onward section to the Tamil Nadu border targeted for November 2026. Metro is further away. The state approved a study for a 16.3 km KR Puram to Hoskote line in February 2026, per Asianet Newsable, but no construction start has been announced, so treat it as a long-dated possibility.
What plot sizes does the layout offer, and how is it planned?
The layout is built around the 30 x 40 ft plot of about 1,200 sq ft, which makes up 49 of the 100 plots. There are 10 larger 30 x 60 ft plots of about 1,800 sq ft and 41 odd sites with irregular shapes. That is a high share of odd sites, and each one needs its own measurements, setbacks and buildable area checked before you agree a price.
The RERA layout data shows two parks or open spaces totalling 2,228 sq m, one civic amenity site of 1,116 sq m and internal roads of 6,816 sq m. On a site of roughly 22,260 sq m, that is about 10 per cent parks, 5 per cent civic amenity and 31 per cent roads. Listed works include roads, footpaths, drainage, electrical poles, a transformer and substation, and plantation. Ask whether a compound wall, sewage lines and a water network to each plot are included.
What will a plot cost, all in?
The price is on request, and no price list had been published as of November 2026. For context only, a Squareyards listing for the first Serenity layout quotes about Rs 4,000 per sq ft, or about Rs 48 lakh for a 1,200 sq ft plot. Other listings for the same Phase 1 show ranges from about Rs 29.6 lakh to Rs 72 lakh. None of these is a Serenity 2 price.
On top of the base rate, ask in writing for corner and park-facing premiums, development charges, BESCOM and water connection charges, and khata transfer costs. Stamp duty and registration in Karnataka add roughly 6.6 per cent for property above Rs 45 lakh in urban areas, with lower rates at or below that threshold; confirm the slab that applies to your plot. The sale of land itself generally sits outside GST, but ask whether any development or amenity charge is billed separately with GST.
What do the RERA record and approvals say about possession?
The record is clean on paper but early in execution: registered 6 November 2026, layout approved by the Hoskote Planning Authority under Plan No. LAO/44/2026-27/922 on 20 July 2026, about 10 per cent of works done, completion due by 5 December 2029. Verify each item on the Karnataka RERA portal before paying, and check again before each major instalment.
Two oddities deserve attention. The PropNewz page shows the status as Upcoming, while RERA shows the project as ongoing with some works done; that reflects a project between pre-launch and launch. And listings for the first phase contradict each other: one Squareyards page shows 14 acres and 265 units in its summary against 165 plots in its text, and also labels the project both Ready to Move and due in December 2027. Rely on the RERA filing, not the portal summary.
How does it compare with nearby plotted options?
It is mid-sized among the plotted layouts registered around Hoskote, and the most comparable options on PropNewz are Royal Quartza at Mallasandra and the much larger Shantika by Sannidhi, which the PropNewz page lists as ready to move.
| Dimension | Sidvin Serenity 2 | Royal Quartza | White Corals | Shantika by Sannidhi |
|---|---|---|---|---|
| Price band | Price on request | Price on request | Price on request | From Rs 84 lakh (indicative) |
| Configurations | 100 plots, mostly 30 x 40 ft | 120 plots, sizes to be confirmed | 17 plots, mostly 30 x 55 ft | About 613 plots (listed) |
| Possession | RERA completion 5 December 2029 | RERA completion 31 December 2030 | RERA completion 31 December 2030 | Ready to move (per PropNewz page) |
| RERA status | Registered, 6 November 2026 | Registered, November 2026 | Registered, November 2026 | Registered |
| Distance to Hoskote town | To be confirmed | To be confirmed | To be confirmed | To be confirmed |
Shantika suits a buyer who wants to build now and will pay for it. Serenity 2 suits one who will wait for a lower entry ticket, if the eventual rate card confirms it.
What are the honest risks and trade-offs?
The main risk is execution time. With about 10 per cent of works done and a completion date three years out, your money is committed long before you can build, and RERA completion dates can be extended. The second is price opacity: an expression of interest with early-bird pricing but no published rate card makes comparison hard, and refund terms for any EOI payment must be in writing and paid into the project account.
The third is supply. Plotted layouts keep registering around Hoskote, including three on PropNewz in the same November week, so resale buyers will have choices. The fourth is services: borewell and panchayat water may not be enough once a layout fills with homes. Use this checklist before paying anything.
| # | Check before booking |
|---|---|
| 1 | Match the RERA number, promoter name, survey numbers, 5.5 acre extent and 100 plots with your documents. |
| 2 | Get the Hoskote Planning Authority approved layout and confirm your plot number and dimensions on it. |
| 3 | Ask for the land conversion order and an encumbrance certificate, and have an advocate check title. |
| 4 | Get a written rate card with all premiums, development and utility charges. |
| 5 | If paying an EOI, get refund terms in writing and pay only into the RERA project account. |
| 6 | Visit the first Serenity layout to judge roads, drains and plot marking. |
| 7 | Ask how water will reach each plot and what khata will be issued at registration. |
What do buyers ask most about Sidvin Serenity 2?
What is the price of plots at Sidvin Serenity 2?
The price is on request, and no rate card has been published as of November 2026. For reference only, a listing for the developer's first Serenity layout quotes about Rs 4,000 per sq ft, which would put a 1,200 sq ft plot near Rs 48 lakh. That is not a Serenity 2 price, so get a written quote.
Is Sidvin Serenity 2 RERA registered and approved?
Yes. Karnataka RERA registered the project on 6 November 2026 under PRM/KA/RERA/1250/304/PR/061126/009086. The Hoskote Planning Authority approved the layout under Plan No. LAO/44/2026-27/922 on 20 July 2026. Check both on the RERA portal and match survey numbers 62/1, 76/1 and 76/2 with your documents.
When will Sidvin Serenity 2 be completed?
The RERA completion date is 5 December 2029. About 10 per cent of the development work was reported done at registration in November 2026, so roads, drainage and power are largely still to come. Expect to wait roughly three years before the layout is ready for house construction.
Who is the developer of Sidvin Serenity 2 and what is its track record?
The promoter on the RERA record is Sidvin Urban Developers, marketed as Sidvin Developers. Its first Serenity layout, nearby, has a RERA completion date of 31 December 2027 and is still under development. The record is short, so visit the first phase and check the promoter's filings before paying.
Is Sidvin Serenity 2 worth considering?
It is worth a look for a patient buyer who wants an approved, RERA registered entry plot near Hoskote and is comfortable holding land until about 2029. The registration and approval are fresh and specific, which is a good start. It is not yet a finished product, the developer's record is short, and the price is unpublished. Visit the first phase, get the rate card and the approved layout in writing, and compare it with a ready plot before committing.
This review reflects information available as of November 11, 2026.
Talk to PropNewz to evaluate this project. Let's chat.
By PropNewz Team