Projects
July 25, 2026

Sattva Mylasandra Review: Mysore Road 1 to 3 BHK Apartments

Sattva Mylasandra is an upcoming Mysore Road high-rise beside Sattva Global City, RERA pending and unpriced. Track it, don't book yet.

The single most important thing a buyer can know about Sattva Mylasandra in July 2026 is that it has no published price. What it has instead is a location argument that is hard to replicate, a 19.16 acre parcel sitting immediately beside Sattva Global City, the developer's own tech park on Mysore Road, on a corridor where the Namma Metro Purple Line already runs to Kengeri and apartment prices have moved roughly 17 percent in a year (99acres, 2026). That mix of an operational metro and a captive employment anchor is why Sattva Mylasandra is worth tracking, even before a rupee figure exists.

The short answer: Sattva Mylasandra is an upcoming Sattva Group high-rise of 1,904 homes planned across 11 towers on 19.16 acres beside Sattva Global City on Mysore Road, with 1, 2, 2.5 and 3 BHK homes from 750 to 1,510 sq ft. Its RERA registration is applied for but not granted, and no price is published. The biggest trade-off is certainty, almost nothing here is fixed yet, from the price to the unit count to the registration, so this is a shortlist candidate, not a purchase decision.

What is Sattva Mylasandra and who is it for?

Sattva Mylasandra is a township-scale high-rise apartment project suited to a buyer who wants an accessible entry into an established South West Bengaluru corridor with an operational metro, and who is comfortable tracking a project through its pre-registration stage rather than buying today. Planned at 1,904 homes across 11 towers rising three basements plus ground plus 40 floors, it is being developed by Sattva Group through Sattva Resi Private Limited. The configuration opens at a compact 1 BHK and tops out near 1,500 sq ft, signalling a project aimed at first-time buyers, young professionals at the adjacent tech park and small families rather than the luxury segment. It fits a patient shortlister, not a buyer needing to transact now.

Can you trust Sattva Group on delivery here?

Sattva Group is among the larger South India developers with a substantial Bengaluru portfolio, and its presence on this stretch is not new, which is central to the project's logic. Building homes next to its own operating tech park is a deliberate strategy that the developer has the local track record to execute. The nuance a buyer should hold is supply concentration rather than competence, Sattva already runs multiple projects on this corridor, including Aaranya, Simplicity and Divinity, so adding close to 1,900 more units from the same developer in the same micro-market means an owner reselling in 2032 may be competing against the developer's own later phases. Delivery capability is not the question here, market saturation is.

How good is the Mysore Road location in 2026?

Mysore Road's real advantage is transit that already exists rather than transit that is promised. The Namma Metro Purple Line runs along this corridor serving the Rajarajeshwari Nagar, Pattanagere and Kengeri stretch, and it is operational today, a meaningful contrast with emerging corridors where buyers are asked to price in an unbuilt line. Mysore Road apartment rates average around Rs 7,900 per sq ft, with Kengeri nearer Rs 10,200 and prices up more than 17 percent over the year (NoBroker, 2026). Road access is anchored by Mysore Road and the NICE Road junction for orbital movement toward Electronic City and Tumkur Road, and the RV College education cluster sits close by. The honest limitation is the airport, which sits diagonally across the city and is a long haul from this quadrant.

What are the homes and configurations like?

The planned configuration mix is unusually broad for a project at this scale, running from a 1 BHK at 750 sq ft, through 2 BHK homes of 1,100 to 1,200 sq ft and a 2.5 BHK of 1,230 to 1,290 sq ft, up to a 3 BHK with two toilets at 1,450 to 1,510 sq ft. Starting at a compact 1 BHK and topping out near 1,500 sq ft signals a project aimed at accessibility rather than the luxury the 40-storey towers might imply. The amenity programme, however, has not been published. For a development of 19.16 acres and nearly 1,900 homes, the clubhouse scale, open-space ratio and facility list will determine daily experience, and none is available yet, so a buyer should ask for the master plan and amenity schedule at formal launch rather than relying on renders.

What will it actually cost?

There is no price, and that is the honest headline. The developer has not published a base rate or unit pricing, and the sheets circulating for this project carry placeholder text rather than figures, so PropNewz will not estimate a number, because a per-square-foot guess on an unlaunched project is exactly the kind of figure that gets quoted back as fact. What a buyer can prepare for is the cost structure, the eventual quoted price will not be the all-in cost. The indicated charge stack covers car parking, clubhouse, preferential-location and floor-rise charges, water and electricity connection, generator and piped-gas provision, a corpus or one-time maintenance payment, recurring monthly maintenance, and statutory GST, stamp duty and registration on top.

What about RERA, approvals and possession?

The registration gap comes first, RERA applied is not RERA approved. The project is listed under BMRDA jurisdiction and its RERA registration has been applied for but not granted, and under the framework a project cannot legally be marketed or sold before registration is issued, so any booking amount, expression of interest or priority payment collected in the interim sits outside statutory protection. Launch is tentatively indicated for the first quarter of 2027 and completion for the first quarter of 2032, both unspecified by the developer and therefore soft. A buyer approached for a pre-registration payment should get refund terms in writing and understand that the protections they may assume they have do not yet exist.

How does it compare with other Mysore Road options?

Against corridor peers, Mylasandra offers an operational metro and a captive employment anchor, with total lack of pricing certainty as the offset. The table sets it beside two nearby alternatives. For a same-builder corridor option see Sattva Bidadi, and for a Kengeri alternative see DS Max Sky Sansidh.

ProjectPrice bandConfigurationsRERA statusMetro access
Sattva MylasandraNot disclosed1 to 3 BHKApplied, not grantedPurple Line operational
Sattva BidadiVerify currentApartmentsVerify on portalMysore Road corridor
DS Max Sky SansidhVerify currentApartmentsVerify on portalKengeri
Mysore Road averageAbout Rs 7,900 psfVariesMixedPurple Line
Kengeri averageAbout Rs 10,200 psfVariesMixedPurple Line terminal

What are the honest risks and trade-offs?

The registration gap comes first, until the certificate is issued there is no statutory backing for the carpet area, specification or completion date. Second, the configuration data is unconfirmed, public reporting describes roughly 10 towers of 36 to 40 floors with more than 2,500 units against the 11 towers and 1,904 units recorded here, and a difference of 600 homes materially changes density and resale competition. Third, the timeline, a tentative 2027 launch and 2032 completion means roughly five years of construction on an uncommitted schedule. Fourth, supply concentration from Sattva's own corridor projects. Fifth, the tall-tower question, at 40 floors maintenance economics, lift downtime and fire-safety compliance deserve more scrutiny than in a mid-rise.

The verdict: is Sattva Mylasandra worth it?

Sattva Mylasandra is worth tracking rather than committing to. The fundamentals are genuinely attractive for the right buyer, an operational metro corridor instead of a promised one, a large employment anchor immediately next door that the developer itself owns, a credible developer with local history, and an entry configuration small enough to be reachable for first-time buyers, a rare combination on this side of the city. The counterweight is that almost nothing is fixed yet, from the price to the unit count to the registration. The sensible position today is to register interest, wait for the RERA certificate and the published price, then compare the launch numbers against the corridor rather than against the brochure.

Does Sattva Mylasandra have RERA approval?

No. The project is under BMRDA jurisdiction and its RERA registration has been applied for but not granted. Under the framework a project cannot legally be marketed or sold before registration, so any booking amount collected in the interim sits outside statutory protection. Buyers should await the certificate and get written refund terms for any pre-registration payment.

What is the price of Sattva Mylasandra?

There is no published price. The developer has not released a base rate, and the pricing sheets in circulation carry placeholder text rather than figures. PropNewz will not estimate a per-square-foot number on an unlaunched project, so buyers should wait for the official price sheet at formal launch and compare it against corridor rates before deciding.

How many units and towers does Sattva Mylasandra have?

The project is recorded here at 1,904 apartments across 11 towers rising three basements plus ground plus 40 floors on 19.16 acres. Public reporting, however, describes roughly 10 towers of 36 to 40 floors with more than 2,500 units, a gap that will only be settled by the RERA filing and that materially affects density and resale competition.

Is Mysore Road well connected by metro?

Yes. The Namma Metro Purple Line is operational along this corridor, serving the Rajarajeshwari Nagar, Pattanagere and Kengeri stretch today, which is a real advantage over emerging corridors relying on unbuilt lines. NICE Road adds orbital access toward Electronic City and Tumkur Road, though the airport remains a long haul from this quadrant.

Your pre-booking checklist

#Check to run before you commit
1Confirm the RERA certificate is granted, not merely applied, before any payment
2Get written refund terms for any pre-registration expression of interest
3Wait for the official published price sheet rather than any circulated placeholder
4Reconcile the unit count, since reporting cites 1,904 against more than 2,500
5Ask for the master plan, open-space ratio and amenity schedule at launch
6Scrutinise lift ratios, maintenance and fire-safety plans for the 40-floor towers
7Weigh resale competition from Sattva's other Mysore Road projects by 2032

This review reflects information available as of July 25, 2026.

Talk to PropNewz to evaluate this project. Let's chat.

By PropNewz Team

Upcoming Projects

Register and stay updated with latest projects!

Thank you! Your submission has been received, We'll get back in touch with you shortly.
Oops! Something went wrong while submitting the form.
Get In Touch

Contact Us

Send us your queries via the form and we'll get in touch with you soon.

Thank you! Your submission has been received, We'll get back in touch with you shortly.
Oops! Something went wrong while submitting the form.
Blog /
Projects

Sattva Mylasandra Review

Sattva Mylasandra is an upcoming Mysore Road high-rise beside Sattva Global City, RERA pending and unpriced. Track it, don't book yet.

Projects
Updated on
July 25, 2026
12 min read

The single most important thing a buyer can know about Sattva Mylasandra in July 2026 is that it has no published price. What it has instead is a location argument that is hard to replicate, a 19.16 acre parcel sitting immediately beside Sattva Global City, the developer's own tech park on Mysore Road, on a corridor where the Namma Metro Purple Line already runs to Kengeri and apartment prices have moved roughly 17 percent in a year (99acres, 2026). That mix of an operational metro and a captive employment anchor is why Sattva Mylasandra is worth tracking, even before a rupee figure exists.

The short answer: Sattva Mylasandra is an upcoming Sattva Group high-rise of 1,904 homes planned across 11 towers on 19.16 acres beside Sattva Global City on Mysore Road, with 1, 2, 2.5 and 3 BHK homes from 750 to 1,510 sq ft. Its RERA registration is applied for but not granted, and no price is published. The biggest trade-off is certainty, almost nothing here is fixed yet, from the price to the unit count to the registration, so this is a shortlist candidate, not a purchase decision.

What is Sattva Mylasandra and who is it for?

Sattva Mylasandra is a township-scale high-rise apartment project suited to a buyer who wants an accessible entry into an established South West Bengaluru corridor with an operational metro, and who is comfortable tracking a project through its pre-registration stage rather than buying today. Planned at 1,904 homes across 11 towers rising three basements plus ground plus 40 floors, it is being developed by Sattva Group through Sattva Resi Private Limited. The configuration opens at a compact 1 BHK and tops out near 1,500 sq ft, signalling a project aimed at first-time buyers, young professionals at the adjacent tech park and small families rather than the luxury segment. It fits a patient shortlister, not a buyer needing to transact now.

Can you trust Sattva Group on delivery here?

Sattva Group is among the larger South India developers with a substantial Bengaluru portfolio, and its presence on this stretch is not new, which is central to the project's logic. Building homes next to its own operating tech park is a deliberate strategy that the developer has the local track record to execute. The nuance a buyer should hold is supply concentration rather than competence, Sattva already runs multiple projects on this corridor, including Aaranya, Simplicity and Divinity, so adding close to 1,900 more units from the same developer in the same micro-market means an owner reselling in 2032 may be competing against the developer's own later phases. Delivery capability is not the question here, market saturation is.

How good is the Mysore Road location in 2026?

Mysore Road's real advantage is transit that already exists rather than transit that is promised. The Namma Metro Purple Line runs along this corridor serving the Rajarajeshwari Nagar, Pattanagere and Kengeri stretch, and it is operational today, a meaningful contrast with emerging corridors where buyers are asked to price in an unbuilt line. Mysore Road apartment rates average around Rs 7,900 per sq ft, with Kengeri nearer Rs 10,200 and prices up more than 17 percent over the year (NoBroker, 2026). Road access is anchored by Mysore Road and the NICE Road junction for orbital movement toward Electronic City and Tumkur Road, and the RV College education cluster sits close by. The honest limitation is the airport, which sits diagonally across the city and is a long haul from this quadrant.

What are the homes and configurations like?

The planned configuration mix is unusually broad for a project at this scale, running from a 1 BHK at 750 sq ft, through 2 BHK homes of 1,100 to 1,200 sq ft and a 2.5 BHK of 1,230 to 1,290 sq ft, up to a 3 BHK with two toilets at 1,450 to 1,510 sq ft. Starting at a compact 1 BHK and topping out near 1,500 sq ft signals a project aimed at accessibility rather than the luxury the 40-storey towers might imply. The amenity programme, however, has not been published. For a development of 19.16 acres and nearly 1,900 homes, the clubhouse scale, open-space ratio and facility list will determine daily experience, and none is available yet, so a buyer should ask for the master plan and amenity schedule at formal launch rather than relying on renders.

What will it actually cost?

There is no price, and that is the honest headline. The developer has not published a base rate or unit pricing, and the sheets circulating for this project carry placeholder text rather than figures, so PropNewz will not estimate a number, because a per-square-foot guess on an unlaunched project is exactly the kind of figure that gets quoted back as fact. What a buyer can prepare for is the cost structure, the eventual quoted price will not be the all-in cost. The indicated charge stack covers car parking, clubhouse, preferential-location and floor-rise charges, water and electricity connection, generator and piped-gas provision, a corpus or one-time maintenance payment, recurring monthly maintenance, and statutory GST, stamp duty and registration on top.

What about RERA, approvals and possession?

The registration gap comes first, RERA applied is not RERA approved. The project is listed under BMRDA jurisdiction and its RERA registration has been applied for but not granted, and under the framework a project cannot legally be marketed or sold before registration is issued, so any booking amount, expression of interest or priority payment collected in the interim sits outside statutory protection. Launch is tentatively indicated for the first quarter of 2027 and completion for the first quarter of 2032, both unspecified by the developer and therefore soft. A buyer approached for a pre-registration payment should get refund terms in writing and understand that the protections they may assume they have do not yet exist.

How does it compare with other Mysore Road options?

Against corridor peers, Mylasandra offers an operational metro and a captive employment anchor, with total lack of pricing certainty as the offset. The table sets it beside two nearby alternatives. For a same-builder corridor option see Sattva Bidadi, and for a Kengeri alternative see DS Max Sky Sansidh.

ProjectPrice bandConfigurationsRERA statusMetro access
Sattva MylasandraNot disclosed1 to 3 BHKApplied, not grantedPurple Line operational
Sattva BidadiVerify currentApartmentsVerify on portalMysore Road corridor
DS Max Sky SansidhVerify currentApartmentsVerify on portalKengeri
Mysore Road averageAbout Rs 7,900 psfVariesMixedPurple Line
Kengeri averageAbout Rs 10,200 psfVariesMixedPurple Line terminal

What are the honest risks and trade-offs?

The registration gap comes first, until the certificate is issued there is no statutory backing for the carpet area, specification or completion date. Second, the configuration data is unconfirmed, public reporting describes roughly 10 towers of 36 to 40 floors with more than 2,500 units against the 11 towers and 1,904 units recorded here, and a difference of 600 homes materially changes density and resale competition. Third, the timeline, a tentative 2027 launch and 2032 completion means roughly five years of construction on an uncommitted schedule. Fourth, supply concentration from Sattva's own corridor projects. Fifth, the tall-tower question, at 40 floors maintenance economics, lift downtime and fire-safety compliance deserve more scrutiny than in a mid-rise.

The verdict: is Sattva Mylasandra worth it?

Sattva Mylasandra is worth tracking rather than committing to. The fundamentals are genuinely attractive for the right buyer, an operational metro corridor instead of a promised one, a large employment anchor immediately next door that the developer itself owns, a credible developer with local history, and an entry configuration small enough to be reachable for first-time buyers, a rare combination on this side of the city. The counterweight is that almost nothing is fixed yet, from the price to the unit count to the registration. The sensible position today is to register interest, wait for the RERA certificate and the published price, then compare the launch numbers against the corridor rather than against the brochure.

Does Sattva Mylasandra have RERA approval?

No. The project is under BMRDA jurisdiction and its RERA registration has been applied for but not granted. Under the framework a project cannot legally be marketed or sold before registration, so any booking amount collected in the interim sits outside statutory protection. Buyers should await the certificate and get written refund terms for any pre-registration payment.

What is the price of Sattva Mylasandra?

There is no published price. The developer has not released a base rate, and the pricing sheets in circulation carry placeholder text rather than figures. PropNewz will not estimate a per-square-foot number on an unlaunched project, so buyers should wait for the official price sheet at formal launch and compare it against corridor rates before deciding.

How many units and towers does Sattva Mylasandra have?

The project is recorded here at 1,904 apartments across 11 towers rising three basements plus ground plus 40 floors on 19.16 acres. Public reporting, however, describes roughly 10 towers of 36 to 40 floors with more than 2,500 units, a gap that will only be settled by the RERA filing and that materially affects density and resale competition.

Is Mysore Road well connected by metro?

Yes. The Namma Metro Purple Line is operational along this corridor, serving the Rajarajeshwari Nagar, Pattanagere and Kengeri stretch today, which is a real advantage over emerging corridors relying on unbuilt lines. NICE Road adds orbital access toward Electronic City and Tumkur Road, though the airport remains a long haul from this quadrant.

Your pre-booking checklist

#Check to run before you commit
1Confirm the RERA certificate is granted, not merely applied, before any payment
2Get written refund terms for any pre-registration expression of interest
3Wait for the official published price sheet rather than any circulated placeholder
4Reconcile the unit count, since reporting cites 1,904 against more than 2,500
5Ask for the master plan, open-space ratio and amenity schedule at launch
6Scrutinise lift ratios, maintenance and fire-safety plans for the 40-floor towers
7Weigh resale competition from Sattva's other Mysore Road projects by 2032

This review reflects information available as of July 25, 2026.

Talk to PropNewz to evaluate this project. Let's chat.

By PropNewz Team

Contact Us

Stay updated with latest news and new projects!

Thank you! Your submission has been received, We'll get back in touch with you shortly.
Oops! Something went wrong while submitting the form.
No pressure, ever

Tell us what you want, We'll do the rest.

Share your budget and where you're looking. An advisor who has actually walked the sites will shortlist a handful of RERA-registered projects and tell you which to skip.

We only contact you about projects you ask about
No spam, no reselling your number, unsubscribe anytime
Independent advice we're paid the same whoever you pick
Thank you! Your submission has been received, We'll get back in touch with you shortly.
Oops! Something went wrong while submitting the form.